Differences between revisions 5 and 10 (spanning 5 versions)
Revision 5 as of 2019-12-09 17:50:24
Size: 228
Editor: miyoki
Comment:
Revision 10 as of 2019-12-09 17:57:16
Size: 670
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
|| RRT training for Alerts || Training for LV alerts and action simulation || Smooth process || || -klog || || RRT training for Alerts || Training for LV alerts and <<BR>> action simulation || Smooth process ||RRT composes of <<BR>>– Local Run Coordinator = S.Miyoki<<BR>>– ISC on-call as commissioning/detector expert = Operator Shift members<<BR>>– Operator = Collaborator Shift Members<<BR>>– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators <<BR>>– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators|| -klog ||

'''Task definition'''<<BR>>
 * Local Run Coordinator
  1. RRT

Theme

Targets

Goals

Method

Results and Homeworks for future

RRT training for Alerts

Training for LV alerts and
action simulation

Smooth process

RRT composes of
– Local Run Coordinator = S.Miyoki
– ISC on-call as commissioning/detector expert = Operator Shift members
– Operator = Collaborator Shift Members
– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators
– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators

-klog

Task definition

  • Local Run Coordinator

KAGRA/EngineeringRun/ER191217_24/forLV (last edited 2019-12-09 18:09:49 by miyoki)