Differences between revisions 6 and 7
Revision 6 as of 2019-12-09 17:53:50
Size: 609
Editor: miyoki
Comment:
Revision 7 as of 2019-12-09 17:54:22
Size: 590
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
|| RRT training for Alerts || Training for LV alerts and <<BR>> action simulation || Smooth process ||– Local run coordinator = S.Miyoki<<BR>>
– ISC on-call as commissioning/detector expert = Operator Shift members<<BR>>
– Operator = Collaborator Shift Members<<BR>>
– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators <<BR>>
– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators <<BR>>|| -klog ||

|| RRT training for Alerts || Training for LV alerts and <<BR>> action simulation || Smooth process ||– Local run coordinator = S.Miyoki<<BR>>– ISC on-call as commissioning/detector expert = Operator Shift members<<BR>>– Operator = Collaborator Shift Members<<BR>>– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators <<BR>>– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators|| -klog ||
  1. RRT

Theme

Targets

Goals

Method

Results and Homeworks for future

RRT training for Alerts

Training for LV alerts and
action simulation

Smooth process

– Local run coordinator = S.Miyoki
– ISC on-call as commissioning/detector expert = Operator Shift members
– Operator = Collaborator Shift Members
– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators
– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators

-klog

KAGRA/EngineeringRun/ER191217_24/forLV (last edited 2019-12-09 18:09:49 by miyoki)