Size: 609
Comment:
|
Size: 612
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
|| RRT training for Alerts || Training for LV alerts and <<BR>> action simulation || Smooth process ||– Local run coordinator = S.Miyoki<<BR>> – ISC on-call as commissioning/detector expert = Operator Shift members<<BR>> – Operator = Collaborator Shift Members<<BR>> – Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators <<BR>> – Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators <<BR>>|| -klog || |
|| RRT training for Alerts || Training for LV alerts and <<BR>> action simulation || Smooth process ||RRT composes of <<BR>>– Local Run Coordinator = S.Miyoki<<BR>>– ISC on-call as commissioning/detector expert = Operator Shift members<<BR>>– Operator = Collaborator Shift Members<<BR>>– Detchar shifter = Very limited Detchar Members + Many Help from KAGRA DAS collaborators <<BR>>– Calibration expert = Very limited CAL Members + Many Help from KAGRA DAS collaborators|| -klog || |
- RRT
Theme |
Targets |
Goals |
Method |
Results and Homeworks for future |
RRT training for Alerts |
Training for LV alerts and |
Smooth process |
RRT composes of |
-klog |