Line 3: Line 3:
 1. Most FFU down test for noise investigation in the corner station  * Noise investigation about FFUs in the corner stations by an operator.
  1. Preparation
   *Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".<<BR>> (Operated FFU / Total FFU) table list is below.<<BR>>130 FFUs will be turned off. This corresponds to 26kW heating power.<<BR>>26kW corresponds to about two water cooler cooling power (2 x 14kW).

 || Area Name ||MCE || IFI || PRM || PR3 || PR2 || BS || SR2 || SR3 || SRM || OMC ||
 || Operation/Total ||2/16||2/12 ||2/12 ||4/16 ||4/20 ||4/20||4/20 ||4/16 ||4/16 ||4/16 ||
<<BR>>
   1.#2 Method(1)
    * Take a sensitivity by an operator.
    * 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
    * Turn off almost FFUs at the same time by 4 people, except for pink one.
    * Take the sensitivity again before alignment will change.
    * Check the difference btw FFU operation and almost no FFU operation. <<BR>>

   * Method(2): If the alignment change is too huge for us to take a sensitivity.
    *

Plans for trial just after ER

  • Noise investigation about FFUs in the corner stations by an operator.
    1. Preparation
      • Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
        (Operated FFU / Total FFU) table list is below.
        130 FFUs will be turned off. This corresponds to 26kW heating power.
        26kW corresponds to about two water cooler cooling power (2 x 14kW).

    Area Name

    MCE

    IFI

    PRM

    PR3

    PR2

    BS

    SR2

    SR3

    SRM

    OMC

    Operation/Total

    2/16

    2/12

    2/12

    4/16

    4/20

    4/20

    4/20

    4/16

    4/16

    4/16


  1. Method(1)
    • Take a sensitivity by an operator.
    • 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
    • Turn off almost FFUs at the same time by 4 people, except for pink one.
    • Take the sensitivity again before alignment will change.
    • Check the difference btw FFU operation and almost no FFU operation.

  2. Method(2): If the alignment change is too huge for us to take a sensitivity.