Differences between revisions 14 and 25 (spanning 11 versions)
Revision 14 as of 2019-12-09 20:54:15
Size: 764
Editor: miyoki
Comment:
Revision 25 as of 2019-12-09 21:06:35
Size: 971
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * Noise investigation about FFUs in the corner stations  * Noise investigation about FFUs in the corner stations by an operator.
  1. Preparation
   *Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".<<BR>> (Operated FFU / Total FFU) table list is below.<<BR>>130 FFUs will be turned off. This corresponds to 26kW heating power.<<BR>>26kW corresponds to about two water cooler cooling ability (2 x 14kW).
Line 5: Line 8:
   1. Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".<<BR>> Operated FFU/Total FFU list is,<<BR>>
 || area name ||MCE || IFI || PRM || PR3 || PR2 || BS || SR2 || SR3 || SRM || OMC ||
   * Take a sensitivity by an operator.
   * 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
   * Turn off almost FFUs at the same time by 4 people, except for pink one.
   * Take the sensitivity again.
   * Check the difference btw FFU operation and alnost-no operation.

 || Area Name ||MCE || IFI || PRM || PR3 || PR2 || BS || SR2 || SR3 || SRM || OMC ||
Line 8: Line 16:
<<BR>>
 * 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
 * Keep taking sensitivity of FPMI condition by an operator.
 * Turn off almost FFUs at the same time by 4 people, except for pink one.
 * Check the difference btw FFU operation and alnost-no operation.

Plans for trial just after ER

  • Noise investigation about FFUs in the corner stations by an operator.
    1. Preparation
      • Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
        (Operated FFU / Total FFU) table list is below.
        130 FFUs will be turned off. This corresponds to 26kW heating power.
        26kW corresponds to about two water cooler cooling ability (2 x 14kW).

    2. Method
      • Take a sensitivity by an operator.
      • 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
      • Turn off almost FFUs at the same time by 4 people, except for pink one.
      • Take the sensitivity again.
      • Check the difference btw FFU operation and alnost-no operation.

    Area Name

    MCE

    IFI

    PRM

    PR3

    PR2

    BS

    SR2

    SR3

    SRM

    OMC

    Operation/Total

    2/16

    2/12

    2/12

    4/16

    4/20

    4/20

    4/20

    4/16

    4/16

    4/16

KAGRA/EngineeringRun/ER191217_24/postERtrial (last edited 2020-01-05 17:30:32 by tatsuki.washimi)