Differences between revisions 25 and 26
Revision 25 as of 2019-12-09 21:06:35
Size: 971
Editor: miyoki
Comment:
Revision 26 as of 2019-12-09 21:08:52
Size: 1022
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
   *Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".<<BR>> (Operated FFU / Total FFU) table list is below.<<BR>>130 FFUs will be turned off. This corresponds to 26kW heating power.<<BR>>26kW corresponds to about two water cooler cooling ability (2 x 14kW).    *Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".<<BR>> (Operated FFU / Total FFU) table list is below.<<BR>>130 FFUs will be turned off. This corresponds to 26kW heating power.<<BR>>26kW corresponds to about two water cooler cooling power (2 x 14kW).
Line 7: Line 7:
  * Method   * Method(1)
Line 11: Line 11:
   * Take the sensitivity again.
   * Check the difference btw FFU operation and alnost-no operation.
   * Take the sensitivity again before alignment will change.
   * Check the difference btw FFU operation and almost no FFU operation.
Line 16: Line 16:

  * Method(2)

Plans for trial just after ER

  • Noise investigation about FFUs in the corner stations by an operator.
    1. Preparation
      • Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
        (Operated FFU / Total FFU) table list is below.
        130 FFUs will be turned off. This corresponds to 26kW heating power.
        26kW corresponds to about two water cooler cooling power (2 x 14kW).

    2. Method(1)
      • Take a sensitivity by an operator.
      • 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
      • Turn off almost FFUs at the same time by 4 people, except for pink one.
      • Take the sensitivity again before alignment will change.
      • Check the difference btw FFU operation and almost no FFU operation.

    Area Name

    MCE

    IFI

    PRM

    PR3

    PR2

    BS

    SR2

    SR3

    SRM

    OMC

    Operation/Total

    2/16

    2/12

    2/12

    4/16

    4/20

    4/20

    4/20

    4/16

    4/16

    4/16

    • Method(2)

KAGRA/EngineeringRun/ER191217_24/postERtrial (last edited 2020-01-05 17:30:32 by tatsuki.washimi)