Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2019-12-09 20:23:13
Size: 186
Editor: miyoki
Comment:
Revision 5 as of 2019-12-09 20:41:15
Size: 542
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
  *1. Method
   * Noise verification due to FFU operation <<br>> in the corner station
  * Method
   1. Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
   * 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
   * Keep taking sensitivity of FPMI condition by an operator.
   * Turn off almost FFUs at the same time by 4 people, except for pink one.
   * Check the difference btw FFU operation and alnost-no operation.

Plans for trial just after ER

  • Noise investigation about FFUs in the corner stations
    • Method
      1. Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
      2. 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
      3. Keep taking sensitivity of FPMI condition by an operator.
      4. Turn off almost FFUs at the same time by 4 people, except for pink one.
      5. Check the difference btw FFU operation and alnost-no operation.

KAGRA/EngineeringRun/ER191217_24/postERtrial (last edited 2020-01-05 17:30:32 by tatsuki.washimi)