Differences between revisions 50 and 57 (spanning 7 versions)
Revision 50 as of 2019-12-10 12:46:30
Size: 1949
Editor: miyoki
Comment:
Revision 57 as of 2019-12-10 12:56:58
Size: 2136
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 || Present FFU(151)/Total FFU(180) ||1/16 || 2/16||12/12 || 12/12 || 16/16 ||20/20 ||20/20||20/20 ||16/16 ||16/16 ||16/16 || several FFUs are disorder ||
 || Remained FFU(35)/Total FFU(180) ||1/16 || 2/16||2/12 ||2/12 ||4/16 ||4/20 ||4/20||4/20 ||4/16 ||4/16 ||4/16 ||
 || Present (151)/Total(180) ||1/16 || 2/16||12/12 || 12/12 || 16/16 ||20/20 ||20/20||20/20 ||16/16 ||16/16 ||16/16 || several FFUs are disorder ||
 || Remained in Test(35)/Total(180) ||1/16 || 2/16||2/12 ||2/12 ||4/16 ||4/20 ||4/20||4/20 ||4/16 ||4/16 ||4/16 ||
Line 12: Line 12:
 || Area Name || IEXYV||
 || Present(2)/Total(10) ||
 || IEXYV || IEXYA || IEXYC(1F) || IEXYC(2F) ||
 || Present(2)/Total(10) || Present(2)/Total(10) || Present(2)/Total(10) || Present(4)/Total(14) || <--- KOACH are not included ||
<<BR>>

 || Corner Station (1F) ||
 || 180+2x24+ 2x10 = 248 ||

Plans for trial just after ER

  • Noise investigation about FFUs in the corner stations by an operator

    1. Preparation
      • Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
        (Operated FFU / Total FFU) table list is below.
        130 FFUs will be turned off. This corresponds to 26kW heating power.
        26kW corresponds to about two water cooler cooling power (2 x 14kW). We expect balance.

    Area Name

    MCF

    MCE

    IFI

    PRM

    PR3

    PR2

    BS

    SR2

    SR3

    SRM

    OMC

    Present (151)/Total(180)

    1/16

    2/16

    12/12

    12/12

    16/16

    20/20

    20/20

    20/20

    16/16

    16/16

    16/16

    several FFUs are disorder

    Remained in Test(35)/Total(180)

    1/16

    2/16

    2/12

    2/12

    4/16

    4/20

    4/20

    4/20

    4/16

    4/16

    4/16


  • IEXYV

    IEXYA

    IEXYC(1F)

    IEXYC(2F)

    Present(2)/Total(10)

    Present(2)/Total(10)

    Present(2)/Total(10)

    Present(4)/Total(14)

    <--- KOACH are not included


  • Corner Station (1F)

    180+2x24+ 2x10 = 248


  1. Method(1)
    • Take a sensitivity by an operator.
    • 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
    • Turn off almost FFUs at the same time by 4 people, except for pink one.
    • Take the sensitivity again before alignment will change.
    • Check the difference btw FFU operation and almost no FFU operation.

  2. Method(2): If the alignment change is too huge for us to take a sensitivity.
    • We turn off IYC-C and BS-C coolers at the same time when we turn off 130 FFUs.
    • Take sensitivity uegently if possible.
    • Check the temp changes in the corner station.
    • If the temp seems to go down rapidly, we enlarge heating power. If the temp gose up rapidly, we turned on IYC-C again and heat up by heaters.
    • we expect do some try and error for several hours if we encounter serious temp change.
    • If alignment comes back, take sensitivity.
    • If it will take too much time to recover FPMI, we give up this trial.

KAGRA/EngineeringRun/ER191217_24/postERtrial (last edited 2020-01-05 17:30:32 by tatsuki.washimi)