3417
Comment:
|
3418
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
=== Plans for trial just after ER === | == Plans for trial just after ER == |
Line 3: | Line 3: |
==Noise investigation about FFUs in the corner stations by an operator== | === Noise investigation about FFUs in the corner stations by an operator === |
Line 63: | Line 63: |
* '''Other items''' | === Other Items === |
Plans for trial just after ER
Noise investigation about FFUs in the corner stations by an operator
- Preparation
Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
(Operated FFU / Total FFU) table list is below.
130 FFUs will be turned off. This corresponds to 26kW heating power.
26kW corresponds to about two water cooler cooling power (2 x 14kW). We expect balance.
Area Name
MCF
MCE
IFI
PRM
PR3
PR2
BS
SR2
SR3
SRM
OMC
Present (151)/Total(180)
1/16
2/16
12/12
12/12
16/16
20/20
20/20
20/20
16/16
16/16
16/16
several FFUs are disorder
Remained in Test(35)/Total(180)
1/16
2/16
2/12
2/12
4/16
4/20
4/20
4/20
4/16
4/16
4/16
IEXYV
IEXYA
IEXYC(1F)
IEXYC(2F)
EXYT
Present(2)/Total(10)
Present(2)/Total(10)
Present(2)/Total(10+1)
Present(4)/Total(14)
Present(3)/Total(3)
<--- KOACH are not included
Corner Station (1F)
180+2x24+ 2x10 + 10(Pre-Rooms) = 258 (~ 51.6kW )
IEXYV
- Take a sensitivity by an operator.
- 4 people stand by IEXYV FFU switchs.
- Turn off remamined two FFUs at the same time.
- Take the sensitivity again before alignment will change.
- Turn on two FFUs that used to be turned on.
- If you see any change in sensitivity, we recheck one by one for IEXYV.
IEXYC(1/2F) and Transmission Area
- Take a sensitivity by an operator.
- 4 people stand by IEXYC FFU switchs. 10 are near the KOACH, 14 near the Transmission area.
- Turn off remained FFUs at the same time.
- Take the sensitivity again before alignment will change.
- Turn on FFUs that used to be turned on.
- If you see any change in sensitivity, we recheck one by one for IEXYC-1F/2F.
IEXYA
- Take a sensitivity by an operator.
- 4 people stand by IEXYA FFU switchs.
- Turn off remained two FFUs at the same time.
- Take the sensitivity again before alignment will change.
- Turn on two FFUs that used to be turned on.
- If you see any change in sensitivity, we recheck one by one for IEXYA.
For Corner station 1F
- Method(1)
- Take a sensitivity by an operator.
- 5 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC), and Pre-Room FFU switchs.
- Turn off almost FFUs at the same time by 4 people, except for pink one.
- Take the sensitivity again before alignment will change.
Check the difference btw FFU operation and almost no FFU operation.
- Method(2): If the alignment change is too huge for us to take a sensitivity.
- We turn off IYC-C and BS-C coolers at the same time when we turn off 130 FFUs.
- Take sensitivity uegently if possible.
- Check the temp changes in the corner station.
- If the temp seems to go down rapidly, we enlarge heating power. If the temp gose up rapidly, we turned on IYC-C again and heat up by heaters.
- we expect do some try and error for several hours if we encounter serious temp change.
- If alignment comes back, take sensitivity.
- If it will take too much time to recover FPMI, we give up this trial.
- Method(1)