== Plans for trial just after ER ==
=== Noise investigation about FFUs in the corner stations by an operator ===
0. Workers
* Measurement 2-4
* Team1 : Furuta, Kimura (Xend)
* Team2 : Hayakawa, Takahashi (Yend)
* Team3 : Tamori, Mori(Xfront)
* Team4 : Yoshimura, TTanaka(Yfront)
* Team5 : Miyoki, Yokozawa, Washimi, (Sensitivity Taking, Instruction to All)
* Team6 : VIS people (temperature drift, suspension condition, in the control room)
* Measurement 5 (Standby at)
* Washimi : (IFI)
* Tamori : (PRM)
* TTanaka : (MCE)
* Kimura : (PR3)
* Yoshimura :(BS, PR2)
* Hayakawa : (SR2, SR3)
* Takahashi : (SRM OMC)
* Mori: (Pre-Room FFU switch for PSL)
* Yokozawa : (Pre-Room FFU switch near PR3, BS)
* Miyoki: SR cooler
* Furuta : BS cooler
* non : IYC cooler
* Measurement 6
* --( Team1 : Furuta, Kimura (Xend) )-- Only center area
* --( Team2 : Hayakawa, Takahashi (Yend) )-- Only center area
* Team3,4 : Mori(BS area), TTanaka(Mori support), Itoh, Kimura(Non clean area) (CS)
* Team5 : Miyoki, Yokozawa, Washimi (k1ctr9)
* Team6 : VIS people (temperature drift, suspension condition, in the control room)
[[attachment:ProcessChart.pdf|工程表(日本語)]]
* Zoom1 connection or PHSで坑内一斉放送?
* 検出きのそばで大きな声を掛け合うのは得策ではない。
1. Preparation
*Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "GreenTape".<
> (Operated FFU / Total FFU) table list is below.<
>130 FFUs will be turned off. This corresponds to 26kW heating power.<
>26kW corresponds to about two water cooler cooling power (2 x 14kW). We expect balance.
|| Area Name ||MCF || MCE || IFI || PRM || PR3 || PR2 || BS || SR2 || SR3 || SRM || OMC ||
|| Present (151)/Total(180) ||1/16 || 2/16||12/12 || 12/12 || 16/16 ||20/20 ||20/20||20/20 ||16/16 ||16/16 ||16/16 || several FFUs are disorder ||
|| Remained in Test(35)/Total(180) ||1/16 || 2/16||2/12 ||2/12 ||4/16 ||4/20 ||4/20||4/20 ||4/16 ||4/16 ||4/16 ||
<
>
|| IEXYV || IEXYA || IEXYC(1F) || IEXYC(2F) || EXYT ||
|| Present(2)/Total(10) || Present(2)/Total(10) || Present(2)/Total(10+1) || Present(4)/Total(14) || Present(3)/Total(3) || <--- KOACH are not included ||
<
>
|| Corner Station (1F) ||
|| 180+2x24+ 2x10 + 10(Pre-Rooms) = 258 (~ 51.6kW )||
<
>
1.#2 '''IEXYV'''
* Take a sensitivity by an operator (one of PEM member). (Miyoki, Yokozawa, Washimi)
* Each 2 people stand by IEXYV FFU switchs. (Team1-> EXV, Team2 -> EYV, Team3->IXV ,Team4->IYV)
* Turn off remained two FFUs at the same time. (Yokozawa -> Team1, Washimi -> team2, Miyoki -> Team3,4)
* Take the sensitivity again before alignment will change. (Miyoki, Yokozawa, Washimi)
* Turn on two FFUs that used to be turned on. (Yokozawa -> Team1, Washimi -> team2, Miyoki -> Team3,4)
* If you see any change in sensitivity, we recheck one by one for IEXYV.
* '''IEXYC(1/2F) and Transmission Area'''
* Take a sensitivity by an operator. (Miyoki, Yokozawa, Washimi)
* Each 2 people stand by IEXYC FFU switchs. 10 are near the KOACH, 14 near the Transmission area. (Team1-> EXC, Team2 -> EYC, Team3->IXC ,Team4->IYC)
* Turn off remained FFUs at the same time. (Yokozawa -> Team1, Washimi -> team2, Miyoki -> Team3,4)
* Take the sensitivity again before alignment will change. (Miyoki, Yokozawa, Washimi)
* Turn on FFUs that used to be turned on. (Yokozawa -> Team1, Washimi -> team2, Miyoki -> Team3,4)
* If you see any change in sensitivity, we recheck one by one for IEXYC-1F/2F.
* '''IEXYA'''
* Take a sensitivity by an operator. (Miyoki, Yokozawa, Washimi)
* 2 people stand by IEXYA FFU switchs. (Team1-> EXA, Team2 -> EYA, Team3->IXA ,Team4->IYA)
* Turn off remained two FFUs at the same time. (Yokozawa -> Team1, Washimi -> team2, Miyoki -> Team3,4)
* Take the sensitivity again before alignment will change. (Miyoki, Yokozawa, Washimi)
* Turn on two FFUs that used to be turned on. (Yokozawa -> Team1, Washimi -> team2, Miyoki -> Team3,4)
* If you see any change in sensitivity, we recheck one by one for IEXYA.
* '''For Corner station 1F'''
1.#2 Method(1)
* Take a sensitivity by an operator. (Miyoki, Yokozawa, Washimi)
* 11 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC), and Pre-Room FFU switchs.
* Turn off almost FFUs at the same time by 11 people, except for Green one.
* Take the sensitivity again before alignment will change. (Miyoki, Yokozawa, Washimi)
* Check the difference btw FFU operation and almost no FFU operation. <
>
* Method(2): If the alignment change is too huge for us to take a sensitivity.
* We turn off IYC-C and BS-C coolers at the same time when we turn off 130 FFUs.
* Take sensitivity urgently if possible. (Miyoki, Yokozawa, Washimi)
* Check the temp changes in the corner station.
* If the temp seems to go down rapidly, we enlarge heating power. If the temp gose up rapidly, we turned on IYC-C again and heat up by heaters.
* we expect do some try and error for several hours if we encounter serious temp change.
* If alignment comes back, take sensitivity. (Miyoki, Yokozawa, Washimi)
* If it will take too much time to recover FPMI, we give up this trial.
* '''Vacuum pump stopping'''
* We want to stop vacuum pumps one by one
* FFU would be turned on
* If temperature or vacuum pressures drastically changed, the experiments stopped
* two people for Xend, two people for Yend, Four people CS
* Stop the Vacuum pump one by one with instruction of Miyoki-san or Saito-san
* Maximum experiment time is two hours or 5p.m.
* Manual : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11150|JGW-E1911150]]
* Assignment : [[attachment:Pump.pmg]]
=== Other Items ===
* Results : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11165]]