Plans for trial just after ER
- Noise investigation about FFUs in the corner stations
- Method
- Make marks on FFU switches that are not turned off in MCE, IFI, PRM, PR3, PR2, BS, SR2, SR3, SRM, OMC with "Pink Tape".
- 4 people stand by (MCE, IFI, PRM), (PR3, PR2, BS), (SR2, SR3), (SRM OMC) FFU switchs.
- Keep taking sensitivity of FPMI condition by an operator.
- Turn off almost FFUs at the same time by 4 people, except for pink one.
- Check the difference btw FFU operation and alnost-no operation.
- Method