Differences between revisions 15 and 20 (spanning 5 versions)
Revision 15 as of 2019-12-10 14:45:27
Size: 1259
Editor: miyoki
Comment:
Revision 20 as of 2019-12-11 12:05:38
Size: 1446
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Schedule  * Rough Schedule
Line 8: Line 8:
 || Dec/16(09:00)~17/(17:00) || Concentrate longer stable operation of FPMI ||
 || Dec/17(17:00) || start ||
 || Dec/24(09:00) || end ||
 || Dec/24(09:00 ~ (17:00) ) || proposed post ER tasks ||
 || Dec/16(Mon,09:00)~17/(Tue,17:00) || Concentrate longer stable operation of FPMI ||
 || Dec/17(Tue, 17:00) || start ||
 || Dec/24(Tue, 09:00) || end ||
 || Dec/24(Tue, 09:00 ~ (17:00) ) || proposed post ER tasks ||
Line 14: Line 14:
  * [[ |IFO(IOO, MIF.LAS)]]   * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/IFO|IFO(IOO, MIF.LAS)]]
Line 20: Line 20:
  * [[ |VIS]]   * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/VIS|VIS]]
Line 25: Line 25:
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/forLV |Special for LV ]]   * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/forLV |Special for LV and O3]]

ER191217~191224

KAGRA/EngineeringRun/ER191217_24 (last edited 2019-12-25 13:05:23 by miyoki)