Line 5: Line 5:
 * Schedule

 || Dec/10-16(09:00) || Commissioning and preparation ||
 || Dec/16(09:00)~17/(17:00) || Concentrate longer stable operation of FPMI ||
 || Dec/17(17:00) || start ||
 || Dec/24(09:00) || end ||
 || Dec/24(09:00 ~ (17:00) ) || proposed post ER tasks ||
Line 18: Line 26:
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/postERtrial| Post ER trial plans]]

ER191217~191224