Differences between revisions 1 and 20 (spanning 19 versions)
Revision 1 as of 2020-03-27 21:20:27
Size: 615
Editor: miyoki
Comment:
Revision 20 as of 2020-03-31 10:26:10
Size: 923
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== ER200331~200407 == == ER200401~200407 ==
Line 3: Line 3:
 * Time :''' From 2020/Mar/31(17:00) to 2020/Apr/7(09:00)'''  * Time :''' From 2020/Apr/1(09:00) to 2020/Apr/7(09:00)'''
Line 7: Line 7:
 || Mar/31(~ 09:00) || Commissioning and preparation ||
 || Mar/31(09:00 ~) || IFO stabilization ||
 || Apr/01 || CAL Day 1 (??:00 - ??:00)||
 || Apr/02 || CAL Day 2 (??:00 - ??:00)||
 || Mar/29 || Commissioning ||
|| Mar/30 || Commissioning ||
 || Mar/31  || Commissioning, IFO stabilization||
 || Mar/31(17:00) || ER start
||
 || Apr/01 || CAL Day 1 (09:00 - ??:00), IFO stabilization||
 || Apr/02 || CAL Day 2 (??:00 - ??:00), IFO stabilization|| No JRPC meeting held, only LVEM call||
Line 14: Line 16:
 || Apr/06 || FF(??-??) ||
 || Apr/07(~ 09:00) || ER End ||
 || Apr/07(09:00 ~) || Observation Start ||
 || Apr/06 || FF(??-??), IFO stabilization ||
 || Apr/07(09:00) || ER end ||
 || Apr/07(09:00-17:15) || IFO stabilization ||
 || Apr/07(17:00 ~) || Observation Start ||
 || || ||
 || Apr/09 || During Observation || If we got positive results, we hope ask something in JRPC meeting ||

ER200401~200407

  • Time : From 2020/Apr/1(09:00) to 2020/Apr/7(09:00)

  • Rough Schedule

    Mar/29

    Commissioning

    Mar/30

    Commissioning

    Mar/31

    Commissioning, IFO stabilization

    Mar/31(17:00)

    ER start

    Apr/01

    CAL Day 1 (09:00 - ??:00), IFO stabilization

    Apr/02

    CAL Day 2 (??:00 - ??:00), IFO stabilization

    No JRPC meeting held, only LVEM call

    Apr/03

    IFO stabilization

    Apr/04

    IFO stabilization

    Apr/05

    IFO stabilization

    Apr/06

    FF(??-??), IFO stabilization

    Apr/07(09:00)

    ER end

    Apr/07(09:00-17:15)

    IFO stabilization

    Apr/07(17:00 ~)

    Observation Start

    Apr/09

    During Observation

    If we got positive results, we hope ask something in JRPC meeting


For shifts

KAGRA/EngineeringRun/ER200401-0407 (last edited 2020-04-15 01:33:58 by HirotakaYuzurihara)