|| Mar/31 || Commissioning, IFO stabilization|| | || Mar/31 || Commissioning, ADS, BPC, IMC angular control, etc || |
Line 13: | Line 13: |
|| Apr/03 || IFO stabilization || || Apr/04 || IFO stabilization || || Apr/05 || IFO stabilization || || Apr/06 || FF(??-??), IFO stabilization || |
|| Apr/03 || ADS, BPC, IMC angular control, etc || || Apr/04 || ADS, BPC, IMC angular control, etc || || Apr/05 || ADS, BPC, IMC angular control, etc || || Apr/06 || ADS, BPC, IMC angular control, etc || |
Line 23: | Line 23: |
|| Apr/21(~09:00) || Observation Start || | || Apr/21(~09:00) || Observation End || || Apr/21(09:00 ~ ) || OMC noise injection and so on || |
ER200401~200407
Time : From 2020/Apr/1(09:00) to 2020/Apr/7(09:00)
- Rough Schedule
Mar/29
Commissioning
Mar/30
Commissioning
Mar/31
Commissioning, ADS, BPC, IMC angular control, etc
Mar/31(17:00)
ER start
Apr/01
CAL Day 1 (09:00 - 17:00), IFO stabilization
Apr/02
CAL Day 2 (09:00 - 17:00), IFO stabilization
No JRPC meeting held, only LVEM call
Apr/03
ADS, BPC, IMC angular control, etc
Apr/04
ADS, BPC, IMC angular control, etc
Apr/05
ADS, BPC, IMC angular control, etc
Apr/06
ADS, BPC, IMC angular control, etc
Apr/07(09:00)
ER end
Apr/07(09:00-17:15)
Maintenance for observation
Apr/07(17:00 ~)
Observation Start
Apr/09
During Observation
If we got positive results, we hope ask something about O3c in JRPC meeting
Apr/21(~09:00)
Observation End
Apr/21(09:00 ~ )
OMC noise injection and so on