Differences between revisions 25 and 26
Revision 25 as of 2020-03-31 12:50:58
Size: 1055
Editor: miyoki
Comment:
Revision 26 as of 2020-03-31 12:56:37
Size: 1130
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 || Mar/31 || Commissioning, IFO stabilization||  || Mar/31 || Commissioning, ADS, BPC, IMC angular control, etc ||
Line 13: Line 13:
 || Apr/03 || IFO stabilization ||
 || Apr/04 || IFO stabilization ||
 || Apr/05 || IFO stabilization ||
 || Apr/06 || FF(??-??), IFO stabilization ||
 || Apr/03 || ADS, BPC, IMC angular control, etc ||
 || Apr/04 || ADS, BPC, IMC angular control, etc ||
 || Apr/05 || ADS, BPC, IMC angular control, etc ||
 || Apr/06 || ADS, BPC, IMC angular control, etc ||

ER200401~200407

  • Time : From 2020/Apr/1(09:00) to 2020/Apr/7(09:00)

  • Rough Schedule

    Mar/29

    Commissioning

    Mar/30

    Commissioning

    Mar/31

    Commissioning, ADS, BPC, IMC angular control, etc

    Mar/31(17:00)

    ER start

    Apr/01

    CAL Day 1 (09:00 - 17:00), IFO stabilization

    Apr/02

    CAL Day 2 (09:00 - 17:00), IFO stabilization

    No JRPC meeting held, only LVEM call

    Apr/03

    ADS, BPC, IMC angular control, etc

    Apr/04

    ADS, BPC, IMC angular control, etc

    Apr/05

    ADS, BPC, IMC angular control, etc

    Apr/06

    ADS, BPC, IMC angular control, etc

    Apr/07(09:00)

    ER end

    Apr/07(09:00-17:15)

    Maintenance for observation

    Apr/07(17:00 ~)

    Observation Start

    Apr/09

    During Observation

    If we got positive results, we hope ask something about O3c in JRPC meeting

    Apr/21(~09:00)

    Observation End

    Apr/21(09:00 ~ )

    OMC noise injection and so on


For shifts

KAGRA/EngineeringRun/ER200401-0407 (last edited 2020-04-15 01:33:58 by HirotakaYuzurihara)