1055
Comment:
|
1629
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== ER200401~200407 == | == ER200401~200407, OBS200407~200421== |
Line 5: | Line 5: |
* Rough Schedule | * Rough Schedule (time can be shifted by 1 or 2 hours according to the task progress and delay) |
Line 9: | Line 9: |
|| Mar/31 || Commissioning, IFO stabilization|| || Mar/31(17:00) || ER start || || Apr/01 || CAL Day 1 (09:00 - 17:00), IFO stabilization|| || Apr/02 || CAL Day 2 (09:00 - 17:00), IFO stabilization|| No JRPC meeting held, only LVEM call|| || Apr/03 || IFO stabilization || || Apr/04 || IFO stabilization || || Apr/05 || IFO stabilization || || Apr/06 || FF(??-??), IFO stabilization || || Apr/07(09:00) || ER end || || Apr/07(09:00-17:15) || Maintenance for observation || || Apr/07(17:00 ~) || Observation Start || |
|| Mar/31 || Commissioning, ADS, BPC, IMC angular control, etc || |
Line 21: | Line 11: |
|| Apr/09 || During Observation || If we got positive results, we hope ask something about O3c in JRPC meeting || | || Mar/31(pm5~) || ER start || || Apr/01 ||(am9-pm5) CAL Day 1, (rest time) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode || || Apr/02 ||(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode for CAL2 || No JRPC meeting held, only LVEM call|| || Apr/03 ||(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode || || Apr/04 ||(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode || || Apr/05 ||(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode || || Apr/06 ||(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode || || Apr/07(~am9) || ER end || |
Line 23: | Line 20: |
|| Apr/21(~09:00) || Observation End || || Apr/21(09:00 ~ ) || OMC noise injection and so on || |
|| Apr/07(am9-pm5) || Maintenance for observation || || Apr/07(pm5~) || Observation Start || || || || || Apr/09 || During Observation || If we got positive results, we hope to ask something about O3c in JRPC meeting || || || || || Apr/16 || During Observation || If we got positive results, we hope to ask something about O3c in JRPC meeting || || || || || Apr/21(~am9) || Observation End || || || || || Apr/21(am9 ~ ) || OMC noise injection and so on || |
Line 28: | Line 34: |
* [[KAGRA/EngineeringRun//ER200331-0407/Shift|Shift manuals]] | * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11578|Shift members]] |
== ER200401~200407, OBS200407~200421==
Time : From 2020/Apr/1(09:00) to 2020/Apr/7(09:00)
- Rough Schedule (time can be shifted by 1 or 2 hours according to the task progress and delay)
Mar/29
Commissioning
Mar/30
Commissioning
Mar/31
Commissioning, ADS, BPC, IMC angular control, etc
Mar/31(pm5~)
ER start
Apr/01
(am9-pm5) CAL Day 1, (rest time) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode
Apr/02
(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode for CAL2
No JRPC meeting held, only LVEM call
Apr/03
(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode
Apr/04
(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode
Apr/05
(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode
Apr/06
(am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode
Apr/07(~am9)
ER end
Apr/07(am9-pm5)
Maintenance for observation
Apr/07(pm5~)
Observation Start
Apr/09
During Observation
If we got positive results, we hope to ask something about O3c in JRPC meeting
Apr/16
During Observation
If we got positive results, we hope to ask something about O3c in JRPC meeting
Apr/21(~am9)
Observation End
Apr/21(am9 ~ )
OMC noise injection and so on