Differences between revisions 30 and 32 (spanning 2 versions)
Revision 30 as of 2020-03-31 13:16:04
Size: 1444
Editor: miyoki
Comment:
Revision 32 as of 2020-03-31 13:19:01
Size: 1452
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 || Mar/31(17:00) || ER start ||  || || ||
|| Mar/31(pm5) || ER start ||
Line 17: Line 18:
 || Apr/07(09:00) || ER end ||
 || Apr/07(09:00-17:15) || Maintenance for observation ||
 || Apr/07(17:00 ~) || Observation Start ||
 || Apr/07(~am9) || ER end ||
 || || ||
 ||
Apr/07(am9-pm5) || Maintenance for observation ||
 || Apr/07(pm5~) || Observation Start ||
Line 23: Line 25:
 || Apr/21(~09:00) || Observation End ||  || Apr/21(~am9) || Observation End ||
Line 25: Line 27:
 || Apr/21(09:00 ~ ) || OMC noise injection and so on ||  || Apr/21(am9 ~ ) || OMC noise injection and so on ||

ER200401~200407

  • Time : From 2020/Apr/1(09:00) to 2020/Apr/7(09:00)

  • Rough Schedule (time can be shifted by 1 or 2 hours according to the task progress and delay)

    Mar/29

    Commissioning

    Mar/30

    Commissioning

    Mar/31

    Commissioning, ADS, BPC, IMC angular control, etc

    Mar/31(pm5)

    ER start

    Apr/01

    (am9-pm5) CAL Day 1, (rest time) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode

    Apr/02

    (am9-pm5) CAL Day 2, (rest time) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode

    No JRPC meeting held, only LVEM call

    Apr/03

    (am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode

    Apr/04

    (am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode

    Apr/05

    (am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode

    Apr/06

    (am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode

    Apr/07(~am9)

    ER end

    Apr/07(am9-pm5)

    Maintenance for observation

    Apr/07(pm5~)

    Observation Start

    Apr/09

    During Observation

    If we got positive results, we hope ask something about O3c in JRPC meeting

    Apr/21(~am9)

    Observation End

    Apr/21(am9 ~ )

    OMC noise injection and so on


For shifts

KAGRA/EngineeringRun/ER200401-0407 (last edited 2020-04-15 01:33:58 by HirotakaYuzurihara)