Line 47: Line 47:
   * Injection failure is improved ?    * Injection failure is improved ? -> Still need to monitor whether cal line is injected or not. In the case of no cal line, we should apply cal line manually. The instruction manual will be prepared by CAL group
Line 49: Line 50:
   * Alignment recorder is installed at proper timing during lock acquisition ?    * Alignment recorder is installed at proper timing during lock acquisition ? -> Alignment Recorder was applied. It works good !
Line 51: Line 53:
   * Whitch are effective, which should be postponed ?    * Which are effective, which should be postponed ? -> ADS for ETMs has need more adjustment. We try ASC by using QPDs on AS table, and try more adjustment about offset for BPC/ADS.
Line 53: Line 56:
   * Successful ?    * It works.
Line 55: Line 59:
   * Improved ? , applying timing is changed ?    * Improved ? , applying timing is changed ? -> Control servo was improved. However, ISS system cannot follow the power up process. So ISS was set to applied at the final stage of the LSC_LOCK guardian. It now wrorks very well.
Line 57: Line 62:
   * Guardian is implemented.    * Guardian is implemented -> It works very well. The kick was minimized.
Line 59: Line 65:
   * Done according to klog ?
   * How about OMC suspensions ?
   * Done according to klog ? -> TypeA, TypeBp were done, while some of Type B will be checked.
   * How about OMC suspensions -> They should be checked because OMC ADS will push OMMTs that has small dynamic range.
Line 62: Line 69:
   * improved ?    * hardware trouble was fixed. However, software troubles still remain. We will keep improving.
Line 64: Line 72:
   * Dewhitening that might contributes a bit to sensitivity should be included or not ?
   * When should we try SAL (monkey) alignment ?
   * How much IMC output power should be selected ?
  * Additional sound proof for bellows
   * Dewhitening for TM that might contributes a bit to sensitivity should be included or not ? -> No problem. Lock_loss during LSC_LOCK guardian due to not saturation but other reason. We will check later.

   * When should we try SAL (monkey) alignment ? -> if you cannot IFO for 1 hours, please try SAL alignment. The beam positions on mirrors, OMC direction are important as checking list.

   * How much IMC output power should be selected ? -> 5W. We have no confidence that 10W can improve the sensitivity.

* Additional sound proof for bellows -> done. we hope some improvement in sensitivity.
Line 73: Line 85:
    * Manual (important check points)     * Manual (important check points) -> please write klog by selecting a category of "Observation".
Line 79: Line 91:
   *

ER200401~200407, OBS200407~200421

  • ER Time : From 2020/Apr/1(09:00) to 2020/Apr/7(09:00)

  • OBS Time : From 2020/Apr/7(17:00) to 2020/Apr/21(09:00)

  • Rough Schedule (time can be shifted by 1 or 2 hours according to the task progress and delay)

    Mar/29

    Commissioning

    Mar/30

    Commissioning

    Mar/31

    Commissioning, ADS, BPC, IMC angular control, etc

    Mar/31(pm5~)

    ER start

    Apr/01

    (am9-pm5) CAL Day 1, (rest time) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode

    Apr/02

    (am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode for CAL2

    No JRPC meeting held, only LVEM call

    Apr/03

    (am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode for CAL2

    Apr/04

    (am9-am1) ADS, BPC, IMC angular control, etc, (am1-am9) silent mode for CAL2

    Apr/05

    (am9-am1) ADS, BPC, IMC angular control, FF adjustment, etc, (am1-am9) silent mode for CAL2

    Apr/06

    (am9-am1) Ocean Violence, (am1-am9) silent mode

    Apr/07(~am9)

    ER end

    Apr/07(am9-pm5)

    Maintenance for observation

    Apr/07(pm5~)

    Observation Start

    Apr/09

    During Observation

    If we got positive results, we hope to ask something about O3c in JRPC meeting

    Apr/16

    During Observation

    If we got positive results, we hope to ask something about O3c in JRPC meeting

    Apr/21(~am9)

    Observation End

    Apr/21(am9 ~ )

    Post Observation Activities : OMC noise injection and so on


For shifts for ER and OBS


Observation : Points to Remember

  • Basic
    • Any problems during Observation will be discussed by Miyoki, Yamamoto, Ito and related group (and SEO members) and we decide the directions. Please report these 3 persons and in "klog" if you notice any problems.
    • If we encounter violent ocean conditions, temporal down of IFO will be selected.
    • Daily morning meeting won't be held during Observation to avoid dense situation. Daily necessary information including from office staffs will be sent via e-mail during 9am-10am.
  • Expected Improvements compared with the previous ER and OBS
    • CAL injection reliability
      • Injection failure is improved ? -> Still need to monitor whether cal line is injected or not. In the case of no cal line, we should apply cal line manually. The instruction manual will be prepared by CAL group

    • Initial oplev (mirror alignment) condition at the starting point of relock process
      • Alignment recorder is installed at proper timing during lock acquisition ? -> Alignment Recorder was applied. It works good !

    • ADS/BPC situation
      • Which are effective, which should be postponed ? -> ADS for ETMs has need more adjustment. We try ASC by using QPDs on AS table, and try more adjustment about offset for BPC/ADS.

    • IMC angular control
      • It works.
    • ISS stability
      • Improved ? , applying timing is changed ? -> Control servo was improved. However, ISS system cannot follow the power up process. So ISS was set to applied at the final stage of the LSC_LOCK guardian. It now wrorks very well.

    • Expected kick at the unlock timing, and known annoying excitation of a suspension system.
      • Guardian is implemented -> It works very well. The kick was minimized.

    • Off load status for each suspension.
      • Done according to klog ? -> TypeA, TypeBp were done, while some of Type B will be checked.

      • How about OMC suspensions -> They should be checked because OMC ADS will push OMMTs that has small dynamic range.

    • Summary page reliability is enhanced ?
      • hardware trouble was fixed. However, software troubles still remain. We will keep improving.
    • SAL (monkey) Alignment reliability
      • Dewhitening for TM that might contributes a bit to sensitivity should be included or not ? -> No problem. Lock_loss during LSC_LOCK guardian due to not saturation but other reason. We will check later.

      • When should we try SAL (monkey) alignment ? -> if you cannot IFO for 1 hours, please try SAL alignment. The beam positions on mirrors, OMC direction are important as checking list.

      • How much IMC output power should be selected ? -> 5W. We have no confidence that 10W can improve the sensitivity.

    • Additional sound proof for bellows -> done. we hope some improvement in sensitivity.

    • Others
  • Actual tasks during OBS
    • Shift Member Duty and Manual :
      • Basic monitoring and recording (by Miyakawa)
        • Manual (important check points) -> please write klog by selecting a category of "Observation".

    • Maintenance Day Activities (from CAL, DGS, FLC/SAF etc groups)
      • SAF/FCL: Weekly SAF/FCL check will be held in the morning on Tuesday (Furuta, Hayakawa, Yoshimura, Kamioka-mine company)
      • DGS:
      • CAL:
    • Restricted Remote Access (from T.Yamamoto)

      • We plan to stop the access to controls@k1gate again from 17:00 on 4/7.
      • If you face some emergency, please use your personal accounts in order to login DGS network.
      • I ask you to use these personal accounts only for a emergency response.
      • If you need remote access to know the site situation, subsystem status, etc as a daily check, please join to develop remote access tools such as SummaryPage, pastavi etc.

      • Unfortunately, some people probably used these accounts for daily monitoring not for a emergency response during previous run. But we need reliable observing data at least during the observing run.


Post Observation Tasks : Items and necessary time

  • 5/18,19 Kashiwa network stop-> no access to/form outside at Kamioka, but inside OK

  • 5/26 11AM~(30min?): 200V power down at Kamioka building.
  • Calibration (~1day) -> Yamamoto

  • Power recycling gain for sidebands (~ 1 day) ->

  • LSC and ASC sensing matrix (~ 2 days) -> Ushiba

  • ISS contribution, frequency noise contribution to DARM (2 days) -> Kokeyama, Miyakawa

  • Finesse/loss measurement for X/Y arm (~ 1 day) ->

  • MICH contrast defect with MICH locked and FPMI locked (~ 1 day) -> Nakano

  • Mode content of AS (OMC cavity scan) (~ 1 day) -> Aso, Kokeyama

  • Scattered light, swing test, IOO investigations (~5days) -> Yokozawa

  • PEM injections (~2day) -> Yokozawa

  • Type Bp measurement with some restricted IFO (~2days) -> Fabian

  • BS measurement with some restricted IFO like simple Michelson (~2days) -> Fabian

  • Type A measurement with some restricted IFO like Xarm (~2days) -> Lucia

  • Feasibility of locking DRFPMI (~ 3 week) -> Nakano