|
Size: 1469
Comment:
|
Size: 1557
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 5: | Line 5: |
| * OMC (Aso, NAOJ) * |
* [[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14515 | OMC (Aso, NAOJ)]] * |
OMC Closing Review (2022/11/18)
OMMT1, OMMT2, OSTM Suspension (Takahasi, NAOJ)
- Transfer Function
- OSEM output values
- Space btw magnets and plates
- Pico motion
Installation Acceptance Document for modified sub-optics in the OMM and OMC chambers (Akutstu, NAOJ)
- OMMT2T optical setting (Ushiba, Akutsu, Miyoki, Sato)
- Final alignment and Iris removal.
- Reliable cover using aluminum foils.
- Vacuum Issues
Clamp preparation -> OK, f300 -> metal, f800 -> elastomer,
TMP/IP alignment OMC-OMMT-TMIPunit.pdf
- Opened viewports confirmation
- Cleaning inside
- Leak in GV again??
- Slow pumping as IFI-IMMT/IMC.
