Size: 457
Comment:
|
Size: 1652
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* OMC (Aso-kun, NAOJ) | * [[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14515 | OMC (Aso, NAOJ)]] * |
Line 7: | Line 8: |
* OMMT1, OMMT2, OSTM Suspension (Takahasi-san, NAOJ) | * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14522 | OMMT1, OMMT2, OSTM Suspension (Takahasi, NAOJ)]] * Transfer Function * OSEM output values * Space btw magnets and plates * Pico motion |
Line 9: | Line 14: |
* Stray light dumping (Akutstu-kun, NAOJ) | * [[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14523 | Installation Acceptance Document for modified sub-optics in the OMM and OMC chambers (Akutstu, NAOJ) ]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22934 | klog#22934 ]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22942 | klog#22942 ]] |
Line 11: | Line 18: |
* OMMT2T optical setting (Ushiba, Miyoki, Akutsu) | * OMMT2T optical setting for sensing OMMT1/SR2 motion separately (Ushiba, Akutsu, Miyoki, Sato) * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22604 | klog#22604 ]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22611 | klog#22611 ]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22844 | klog#22844 ]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22848 | klog#22848 ]] |
Line 13: | Line 24: |
* Final alignment and Iris removal. * Reliable cover using aluminum foils. |
|
Line 15: | Line 28: |
* TMP/IP alignment * Trouble in a -Y side Hatch |
* Clamp preparation -> OK, f300 -> metal, f800 -> elastomer, * TMP/IP alignment [[attachment:OMC-OMMT-TMIPunit.pdf]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22948 | Trouble in a -Y side Hatch]] |
Line 19: | Line 33: |
* Leak in GV again?? | * Leak in GV_srm-OMM again?? * Slow pumping as IFI-IMMT/IMC -> Suspension Monitoring(Takahashi-san + alpha) |
OMC Closing Review (2022/11/18)
OMMT1, OMMT2, OSTM Suspension (Takahasi, NAOJ)
- Transfer Function
- OSEM output values
- Space btw magnets and plates
- Pico motion
Installation Acceptance Document for modified sub-optics in the OMM and OMC chambers (Akutstu, NAOJ)
- OMMT2T optical setting for sensing OMMT1/SR2 motion separately (Ushiba, Akutsu, Miyoki, Sato)
- Final alignment and Iris removal.
- Reliable cover using aluminum foils.
- Vacuum Issues
Clamp preparation -> OK, f300 -> metal, f800 -> elastomer,
TMP/IP alignment OMC-OMMT-TMIPunit.pdf
- Opened viewports confirmation
- Cleaning inside
- Leak in GV_srm-OMM again??
Slow pumping as IFI-IMMT/IMC -> Suspension Monitoring(Takahashi-san + alpha)