Size: 1242
Comment:
|
Size: 1663
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* OMC (Aso-kun, NAOJ) * |
* [[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14515 | OMC (Aso, NAOJ)]] * |
Line 8: | Line 8: |
* OMMT1, OMMT2, OSTM Suspension (Takahasi-san, NAOJ) | * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14522 | OMMT1, OMMT2, OSTM Suspension (Takahasi, NAOJ)]] |
Line 14: | Line 14: |
* Stray light dumping (Akutstu-kun, NAOJ) | * [[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14523 | Installation Acceptance Document for modified sub-optics in the OMM and OMC chambers (Akutstu, NAOJ) ]] |
Line 18: | Line 18: |
* OMMT2T optical setting (Ushiba, Akutsu, Miyoki, Sato) | * OMMT2T optical setting for sensing OMMT1/SR2 motion separately (Ushiba, Akutsu, Miyoki, Sato, Takahashi) |
Line 33: | Line 33: |
* Leak in GV again?? * Slow pumping as IFI-IMMT/IMC. |
* Leak in GV_srm-OMM again?? * Slow pumping as IFI-IMMT/IMC -> Suspension Monitoring(Takahashi-san + alpha) |
OMC Closing Review (2022/11/18)
OMMT1, OMMT2, OSTM Suspension (Takahasi, NAOJ)
- Transfer Function
- OSEM output values
- Space btw magnets and plates
- Pico motion
Installation Acceptance Document for modified sub-optics in the OMM and OMC chambers (Akutstu, NAOJ)
- OMMT2T optical setting for sensing OMMT1/SR2 motion separately (Ushiba, Akutsu, Miyoki, Sato, Takahashi)
- Final alignment and Iris removal.
- Reliable cover using aluminum foils.
- Vacuum Issues
Clamp preparation -> OK, f300 -> metal, f800 -> elastomer,
TMP/IP alignment OMC-OMMT-TMIPunit.pdf
- Opened viewports confirmation
- Cleaning inside
- Leak in GV_srm-OMM again??
Slow pumping as IFI-IMMT/IMC -> Suspension Monitoring(Takahashi-san + alpha)