OMC Closing Review (2022/11/18)
OMMT1, OMMT2, OSTM Suspension (Takahasi, NAOJ)
- Transfer Function
- OSEM output values
- Space btw magnets and plates
- Pico motion
Installation Acceptance Document for modified sub-optics in the OMM and OMC chambers (Akutstu, NAOJ)
- OMMT2T optical setting for sensing OMMT1/SR2 motion separately (Ushiba, Akutsu, Miyoki, Sato)
- Final alignment and Iris removal.
- Reliable cover using aluminum foils.
- Vacuum Issues
Clamp preparation -> OK, f300 -> metal, f800 -> elastomer,
TMP/IP alignment OMC-OMMT-TMIPunit.pdf
- Opened viewports confirmation
- Cleaning inside
- Leak in GV_srm-OMM again??
Slow pumping as IFI-IMMT/IMC -> Suspension Monitoring(Takahashi-san + alpha)