KAGRA/IFOInt------ [[ IMC recovery(20240322) | ]] ------ * Suspensions(R.Takahashi) * Mechanical Motion * Smooth pico motion and its default position * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> --(A.I. upload pitch pico pictures (R.Takahashi), or taking picture for pitch pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941 * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909 -> --(A.I. upload pitch, yaw pico pictures (R.Takahashi), or taking picture for pitch, yaw pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941 * Gaps between magnets and coils -> MCo upper is the minimum, but this is the best effort. * Gaps between EQ stoppers and mirrors -> confirmed less than 1mm. * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915 * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913 * Electrical wirings * Coil resistances and inductances -> A.I. Inductances should refer the past data if the coil did not change, or it will be measured again (Wasimi, 3/24(Monday morning) * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28668 -> A.I. MCo H4 looks high, it could be disconnection. It should be measured again (Wasimi, 3/24(Monday morning). *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696 -> One of the MCi resistances is low, but low may have no problem. If it is high, it may have some disconnection. * Isolation of Wiring from coils to flanges(pico and mag-coil) -> MCi could not be accessed. * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911 -> improved * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910 -> improved * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914 -> This does not matter for the suspension. * Fixing on tables is tight and reliable? * Smooth Mag-coil motion and balance and TFs * balance can be adjusted after closing? * MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28938 * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28939 * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940 -> A.I. Peak of pitch-shifted to higher frequency from the result of Feb.2. Needs remote centering for the Oplev first (Ushiba). * Mirror conditions(Y.Aso) * Clean around the center? * MCe has a spot near the center. But its influence is expected to be small. * Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856 * Alignment(T.Akutsu, T.Ushiba, T.Yokozawa) * TEM00 flashing * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28912 * The IMC trans beam is the same as before? * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28779 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28839 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28937 * Beam positions on each mirror * They should be the same because the IMC trans was recovered in MCio? * How about on MCe? MCE tra QPD can be the reference. * QPD path and centering * Gaps between magnets and coils again * IP1/2 dynamic range check for the IMC injection? * Beam paths for IMC REFL. *Beam dump(T.Akutsu) * Beam shield reinstallation * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28927 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28926 * Beam dumps were additionally added? * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931 -> Inside of beam duct between PSL and iMC looks shining. * Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki) * Cleaning * No dust inside, especially on the bottom? -> A.I. before closing. * Leak point was fastened tightly? -> A.I. when closing. * It will be done when the bellows are attached by Mirapro. * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326) -> it will be done on Mon. * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344) * Flange surface check to avoid leaking especially on GV_mcf * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?). -> measurement of length of legs. ---- [[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]] ---- Summary ---- * TF of MCe had a shift of peak frequency on the pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later. * All others should be OK for closing IMC chambers. * The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway. * Washimi-kun will measure inductances again on Monday. * Check no dust inside, especially on the bottom before closing. * Check the leak points are fastened tightly when closing.