Line 4: Line 4:
 * Suspensions
  *
 * Suspensions(R.Takahashi)
  * Electrical wirings
   * Coil resistances and inductances
   * Isolation of Wiring from coils to flanges(pico and mag-coil)
   * Fixing on tables is tight and reliable?
  * Mechanical Motion
   * Smooth pico motion and its default position
   * Smooth Mag-coil motion and balance and TFs
    * balance can be adjusted after closing?
   * Gaps between magnets and coils
   * Gaps between EQ stoppers and mirrors
Line 7: Line 16:
 * Alignment  * Mirror conditions(Y.Aso)
  * Clean around the center?
   * MCe has a spot near the center. But its influence is expected to be small.
Line 9: Line 20:
 *  * Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
  * TEM00 flashing
  * The IMC trans beam is the same as before?
  * Beam positions on each mirror
   * They should be the same because the IMC trans was recovered in MCio?
   * How about on MCe? MCE tra QPD can be the reference.
  * QPD path and centering
  * Gaps between magnets and coils again
  * IP1/2 dynamic range check for the IMC injection?
  * Beam paths for IMC REFL.

 *Beam damping(T.Akutsu)
  * Beam shield reinstallation
  * Beam dampers were additionally added?

 * Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
  * Cleaning
   * No dust inside, especially on the bottom?
  * Leak point was fastened tightly?
   * It will be done when the bellows are attached by Mirapro.
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * Flange surface check to avoid leaking especially on GV_mcf
  * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).


IMC Ecovery(20240322)


  • Suspensions(R.Takahashi)
    • Electrical wirings
      • Coil resistances and inductances
      • Isolation of Wiring from coils to flanges(pico and mag-coil)
      • Fixing on tables is tight and reliable?
    • Mechanical Motion
      • Smooth pico motion and its default position
      • Smooth Mag-coil motion and balance and TFs
        • balance can be adjusted after closing?
      • Gaps between magnets and coils
      • Gaps between EQ stoppers and mirrors
  • Mirror conditions(Y.Aso)
    • Clean around the center?
      • MCe has a spot near the center. But its influence is expected to be small.
  • Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
    • TEM00 flashing
    • The IMC trans beam is the same as before?
    • Beam positions on each mirror
      • They should be the same because the IMC trans was recovered in MCio?
      • How about on MCe? MCE tra QPD can be the reference.
    • QPD path and centering
    • Gaps between magnets and coils again
    • IP1/2 dynamic range check for the IMC injection?
    • Beam paths for IMC REFL.
  • Beam damping(T.Akutsu)
    • Beam shield reinstallation
    • Beam dampers were additionally added?
  • Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
    • Cleaning
      • No dust inside, especially on the bottom?
    • Leak point was fastened tightly?
      • It will be done when the bellows are attached by Mirapro.
    • MCE trans flange rotation
    • Lift-up tool check for bellows installation.
    • Flange surface check to avoid leaking especially on GV_mcf
    • FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).