Line 2: Line 2:
IMC Ecovery(20240322) IMC recovery(20240322)
Line 5: Line 5:
  * Mechanical Motion
   * Smooth pico motion and its default position
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> A.I. upload picth pico pictues (R.Takahashi), or taking picture for picth pico.
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909 -> A.I. upload picth, yaw pico pictues (R.Takahashi), or taking picture for picth, yaw pico.
   * Gaps between magnets and coils
   * Gaps between EQ stoppers and mirrors
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913
Line 12: Line 20:
    * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914
Line 13: Line 22:
  * Mechanical Motion
   * Smooth pico motion and its default position
   * Smooth Mag-coil motion and balance and TFs
    * balance can be adjusted after closing?
   * Gaps between magnets and coils
   * Gaps between EQ stoppers and mirrors
  * Smooth Mag-coil motion and balance and TFs
   * balance can be adjusted after closing?
   * MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28938
   * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28939
   * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940
Line 23: Line 31:
   * Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856
Line 26: Line 35:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28912
Line 27: Line 37:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28779
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28839
Line 35: Line 47:
 *Beam damping(T.Akutsu)  *Beam dump(T.Akutsu)
Line 37: Line 49:
  * Beam dampers were additionally added?    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28927
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28926
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931
Line 44: Line 59:
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326)
  * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344)
Line 48: Line 63:

----

[[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]]


------
??? Recovery(202404??)
------



------
??? Recovery(202404??)
------


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


??? Recovery(202404??)



??? Recovery(202404??)