Differences between revisions 18 and 39 (spanning 21 versions)
Revision 18 as of 2024-03-21 18:36:28
Size: 2556
Editor: miyoki
Comment:
Revision 39 as of 2024-03-22 13:13:10
Size: 3244
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
IMC Ecovery(20240322) IMC recovery(20240322)
Line 5: Line 5:
  * Mechanical Motion
   * Smooth pico motion and its default position
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> A.I. upload picth pico pictues (R.Takahashi), or taking picture for picth pico.
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909
   * Gaps between magnets and coils
   * Gaps between EQ stoppers and mirrors
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913
Line 14: Line 22:
  * Mechanical Motion
 
* Smooth pico motion and its default position
    *
   * Smooth
Mag-coil motion and balance and TFs
    * balance can be adjusted after closing?
    * Health MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28890
    * Health
MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28889
    * Health
MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
   * Gaps between magnets and coils
   * Gaps between EQ stoppers and mirrors
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913
  * Smooth Mag-coil motion and balance and TFs
   * balance can be adjusted after closing?
   * MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28938
   *
MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28939
   *
MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940
Line 46: Line 47:
 *Beam damping(T.Akutsu)  *Beam dump(T.Akutsu)
Line 50: Line 51:
  * Beam dampers were additionally added?   * Beam dumps were additionally added?
   * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931
Line 57: Line 59:
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326)
  * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344)
Line 61: Line 63:

----

[[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]]


------
??? Recovery(202404??)
------



------
??? Recovery(202404??)
------


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


??? Recovery(202404??)



??? Recovery(202404??)


KAGRA/IFOIntegration2024/Recovery20240322 (last edited 2024-04-05 16:16:04 by miyoki)