Differences between revisions 2 and 11 (spanning 9 versions)
Revision 2 as of 2024-03-21 10:07:45
Size: 432
Editor: miyoki
Comment:
Revision 11 as of 2024-03-21 12:42:10
Size: 1865
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Suspensions  * Suspensions(R.Takahashi)
Line 6: Line 6:
   * Coil resistances    * Coil resistances and inductances
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28668
    *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696
Line 8: Line 10:
   *     * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910
   * Fixing on tables is tight and reliable?
Line 10: Line 14:
   * Pico motion and its default position
   * Mag-coil motion and balance and TFs
   * Pushing balance (later?)
   * Smooth pico motion and its default position
   * Smooth Mag-coil motion and balance and TFs
    * balance can be adjusted after closing?
   * Gaps between magnets and coils
   * Gaps between EQ stoppers and mirrors
Line 14: Line 20:
 * Alignment  * Mirror conditions(Y.Aso)
  * Clean around the center?
   * MCe has a spot near the center. But its influence is expected to be small.

 * Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
  * TEM00 flashing
  * The IMC trans beam is the same as before?
  * Beam positions on each mirror
   * They should be the same because the IMC trans was recovered in MCio?
   * How about on MCe? MCE tra QPD can be the reference.
Line 16: Line 31:
  *TEM00 flashing   * Gaps between magnets and coils again
  * IP1/2 dynamic range check for the IMC injection?
  * Beam paths for IMC REFL.
Line 18: Line 35:
 *Ghost beam damping
  *Additionally done?
  *
 *Beam damping(T.Akutsu)
  * Beam shield reinstallation
  * Beam dampers were additionally added?

 * Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
  * Cleaning
   * No dust inside, especially on the bottom?
  * Leak point was fastened tightly?
   * It will be done when the bellows are attached by Mirapro.
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * Flange surface check to avoid leaking especially on GV_mcf
  * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).


IMC Ecovery(20240322)


  • Suspensions(R.Takahashi)
  • Mirror conditions(Y.Aso)
    • Clean around the center?
      • MCe has a spot near the center. But its influence is expected to be small.
  • Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
    • TEM00 flashing
    • The IMC trans beam is the same as before?
    • Beam positions on each mirror
      • They should be the same because the IMC trans was recovered in MCio?
      • How about on MCe? MCE tra QPD can be the reference.
    • QPD path and centering
    • Gaps between magnets and coils again
    • IP1/2 dynamic range check for the IMC injection?
    • Beam paths for IMC REFL.
  • Beam damping(T.Akutsu)
    • Beam shield reinstallation
    • Beam dampers were additionally added?
  • Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
    • Cleaning
      • No dust inside, especially on the bottom?
    • Leak point was fastened tightly?
      • It will be done when the bellows are attached by Mirapro.
    • MCE trans flange rotation
    • Lift-up tool check for bellows installation.
    • Flange surface check to avoid leaking especially on GV_mcf
    • FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).

KAGRA/IFOIntegration2024/Recovery20240322 (last edited 2024-04-05 16:16:04 by miyoki)