Differences between revisions 3 and 27 (spanning 24 versions)
Revision 3 as of 2024-03-21 10:30:12
Size: 1355
Editor: miyoki
Comment:
Revision 27 as of 2024-03-22 08:46:10
Size: 3134
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Suspensions  * Suspensions(R.Takahashi)
Line 6: Line 6:
   * Coil resistances    * Coil resistances and inductances
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28668
    *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696
Line 8: Line 10:
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910
    * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914
Line 11: Line 16:
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907
Line 13: Line 19:
    * Health MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28890
    * Health MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28889
    * Health MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
Line 15: Line 24:
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913
Line 16: Line 27:
 * Mirror conditions  * Mirror conditions(Y.Aso)
Line 19: Line 30:
   * Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856
Line 20: Line 32:
 * Alignment  * Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
Line 22: Line 34:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28912
Line 23: Line 36:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28779
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28839
Line 25: Line 40:
   * How about on MCe?    * How about on MCe? MCE tra QPD can be the reference.
Line 29: Line 44:
  * Beam paths for IMC REFL.
Line 30: Line 46:
 *Beam damping  *Beam damping(T.Akutsu)
Line 32: Line 48:
  * Beam dampers were additionally done?    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28927
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28926
  * Beam dampers were additionally added?
   * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931
Line 34: Line 53:
 * Vacuum  * Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
Line 39: Line 58:
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326)
  * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344)
Line 42: Line 61:
  * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).

----

[[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]]


------
??? Recovery(202404??)
------



------
??? Recovery(202404??)
------


IMC Ecovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


??? Recovery(202404??)



??? Recovery(202404??)


KAGRA/IFOIntegration2024/Recovery20240322 (last edited 2024-04-05 16:16:04 by miyoki)