Line 2: Line 2:
IMC Ecovery(20240322) IMC recovery(20240322)
Line 4: Line 4:
 * Suspensions
  * Electrical wirings
   * Coil resistances
   * Isolation of Wiring from coils to flanges(pico and mag-coil)
   * Fixing on tables is tight and reliable?
 * Suspensions(R.Takahashi)
Line 11: Line 7:
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909
Line 13: Line 11:
    * Health MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911
    * Health MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910
    * Health MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
Line 15: Line 16:
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913
  * Electrical wirings
   * Coil resistances and inductances
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28668
    *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696
   * Isolation of Wiring from coils to flanges(pico and mag-coil)
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910
    * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914
   * Fixing on tables is tight and reliable?
Line 16: Line 28:
 * Mirror conditions  * Mirror conditions(Y.Aso)
Line 19: Line 31:
   * Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856
Line 20: Line 33:
 * Alignment  * Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
Line 22: Line 35:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28912
Line 23: Line 37:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28779
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28839
Line 25: Line 41:
   * How about on MCe?    * How about on MCe? MCE tra QPD can be the reference.
Line 29: Line 45:
  * Beam paths for IMC REFL.
Line 30: Line 47:
 *Beam damping  *Beam dump(T.Akutsu)
Line 32: Line 49:
  * Beam dampers were additionally done?    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28927
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28926
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931
Line 34: Line 54:
 * Vacuum  * Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
Line 39: Line 59:
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326)
  * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344)
Line 42: Line 62:
  * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).

----

[[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]]


------
??? Recovery(202404??)
------



------
??? Recovery(202404??)
------


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


??? Recovery(202404??)



??? Recovery(202404??)