Differences between revisions 3 and 66 (spanning 63 versions)
Revision 3 as of 2024-03-21 10:30:12
Size: 1355
Editor: miyoki
Comment:
Revision 66 as of 2024-03-22 14:55:11
Size: 4914
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
IMC Ecovery(20240322) IMC recovery(20240322)
Line 4: Line 4:
 * Suspensions
  * Electrical wirings
   * Coil resistances
   * Isolation of Wiring from coils to flanges(pico and mag-coil)
   * Fixing on tables is tight and reliable?
 * Suspensions(R.Takahashi)
Line 11: Line 7:
   * Smooth Mag-coil motion and balance and TFs
    * balance can be adjusted after closing?
   * Gaps between magnets and coils
   * Gaps between EQ stoppers and mirrors
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> --(A.I. upload picth pico pictues (R.Takahashi), or taking picture for picth pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909 -> --(A.I. upload pitch, yaw pico pictures (R.Takahashi), or taking picture for pitch, yaw pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941
   * Gaps between magnets and coils -> MCo upper is the minimum, but this is the best effort.
   * Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913
  * Electrical wirings
   * Coil resistances and inductances -> A.I. Inductances should refer the past data if the coil did not change, or it will be measured again (Wasimi, 3/24(Monday morning)
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28668 -> A.I. MCo H4 looks high, it could be disconnection. It should be measured again (Wasimi, 3/24(Monday morning).
    *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696 -> One of the MCi resistances is low, but low may have no problem. If it is high, it may have some disconnection.
   * Isolation of Wiring from coils to flanges(pico and mag-coil) -> MCi could not be accessed.
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911 -> improved
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910 -> improved
    * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914 -> this does not matter for the suspension.
   * Fixing on tables is tight and reliable?
  * Smooth Mag-coil motion and balance and TFs
   * balance can be adjusted after closing?
   * MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28938
   * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28939
   * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940 -> A.I. Peak of pitch shifted to higher frequency from result of Feb.2. Needs remote centering for the Oplev first (Ushiba).
Line 16: Line 28:
 * Mirror conditions  * Mirror conditions(Y.Aso)
Line 19: Line 31:
   * Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856
Line 20: Line 33:
 * Alignment  * Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
Line 22: Line 35:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28912
Line 23: Line 37:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28779
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28839
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28937
Line 25: Line 42:
   * How about on MCe?    * How about on MCe? MCE tra QPD can be the reference.
Line 29: Line 46:
  * Beam paths for IMC REFL.
Line 30: Line 48:
 *Beam damping  *Beam dump(T.Akutsu)
Line 32: Line 50:
  * Beam dampers were additionally done?    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28927
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28926
  * Beam dumps were additionally added?
   * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931 -> Inside of beam duct between PSL and iMC looks shining.
Line 34: Line 55:
 * Vacuum  * Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
Line 36: Line 57:
   * No dust inside, especially on the bottom?
  * Leak point was fastened tightly?
   * No dust inside, especially on the bottom? -> A.I. before closing.
  * Leak point was fastened tightly? -> A.I. when closing.
Line 39: Line 60:
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326) -> it will be done on Mon.
  * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344)
Line 42: Line 63:
  * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?). -> measurement of length of legs.

----

[[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]]


-------
Summary
-------
 * TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
 * All others should be OK for closing IMC chambers.
  * The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
  * Washimi-kun will measure inductances again on Monday.
  * Check no dust inside, especially on the bottom before closing.
  * Check the leak points are fastened tightly when closing.


------
??? Recovery(202404??)
------



------
??? Recovery(202404??)
------


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


Summary


  • TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
  • All others should be OK for closing IMC chambers.
    • The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
    • Washimi-kun will measure inductances again on Monday.
    • Check no dust inside, especially on the bottom before closing.
    • Check the leak points are fastened tightly when closing.


??? Recovery(202404??)



??? Recovery(202404??)