* Suspensions * Electrical wirings * Coil resistances * Isolation of Wiring from coils to flanges(pico and mag-coil) * Fixing on tables is tight and reliable? |
* Suspensions(R.Takahashi) |
Line 11: | Line 7: |
* Smooth Mag-coil motion and balance and TFs * balance can be adjusted after closing? |
* MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> A.I. upload picth pico pictues (R.Takahashi), or taking picture for picth pico. * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909 |
Line 15: | Line 11: |
* MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915 * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913 * Electrical wirings * Coil resistances and inductances * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28668 *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696 * Isolation of Wiring from coils to flanges(pico and mag-coil) * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911 * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910 * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914 * Fixing on tables is tight and reliable? * Smooth Mag-coil motion and balance and TFs * balance can be adjusted after closing? * MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28938 * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28939 * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940 |
|
Line 16: | Line 28: |
* Mirror conditions | * Mirror conditions(Y.Aso) |
Line 19: | Line 31: |
* Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856 | |
Line 20: | Line 33: |
* Alignment | * Alignment(T.Akutsu, T.Ushiba, T.Yokozawa) |
Line 22: | Line 35: |
* https://klog.icrr.u-tokyo.ac.jp/osl/?r=28912 | |
Line 23: | Line 37: |
* https://klog.icrr.u-tokyo.ac.jp/osl/?r=28779 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28839 |
|
Line 25: | Line 41: |
* How about on MCe? | * How about on MCe? MCE tra QPD can be the reference. |
Line 31: | Line 47: |
*Beam damping | *Beam dump(T.Akutsu) |
Line 33: | Line 49: |
* Beam dampers were additionally done? | * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28927 * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28926 * Beam dumps were additionally added? * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931 |
Line 35: | Line 54: |
* Vacuum | * Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki) |
Line 40: | Line 59: |
* MCE trans flange rotation * Lift-up tool check for bellows installation. |
* MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326) * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344) |
Line 43: | Line 62: |
* FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?). ---- [[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]] ------ ??? Recovery(202404??) ------ ------ ??? Recovery(202404??) ------ |
IMC recovery(20240322)
- Suspensions(R.Takahashi)
- Mechanical Motion
- Smooth pico motion and its default position
MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> A.I. upload picth pico pictues (R.Takahashi), or taking picture for picth pico.
- Gaps between magnets and coils
- Gaps between EQ stoppers and mirrors
- Smooth pico motion and its default position
- Electrical wirings
- Coil resistances and inductances
- Isolation of Wiring from coils to flanges(pico and mag-coil)
- Fixing on tables is tight and reliable?
- Smooth Mag-coil motion and balance and TFs
- balance can be adjusted after closing?
- Mechanical Motion
- Mirror conditions(Y.Aso)
- Clean around the center?
- MCe has a spot near the center. But its influence is expected to be small.
Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856
- Clean around the center?
- Alignment(T.Akutsu, T.Ushiba, T.Yokozawa)
- TEM00 flashing
- The IMC trans beam is the same as before?
- Beam positions on each mirror
- They should be the same because the IMC trans was recovered in MCio?
- How about on MCe? MCE tra QPD can be the reference.
- QPD path and centering
- Gaps between magnets and coils again
- IP1/2 dynamic range check for the IMC injection?
- Beam paths for IMC REFL.
- Beam dump(T.Akutsu)
- Beam shield reinstallation
- Beam dumps were additionally added?
In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931
- Vacuum, etc (N.Kimura, T.Uchiyama, S.Miyoki)
- Cleaning
- No dust inside, especially on the bottom?
- Leak point was fastened tightly?
- It will be done when the bellows are attached by Mirapro.
MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326)
Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344)
- Flange surface check to avoid leaking especially on GV_mcf
- FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).
- Cleaning
one of templates for IMC closing by Akutsu-kun in 2021.
??? Recovery(202404??)