Line 39: Line 39:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28937
Line 52: Line 53:
   * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931    * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931 -> Inside of beam duct between PSL and iMC looks shining.
Line 56: Line 57:
   * No dust inside, especially on the bottom?
  * Leak point was fastened tightly?
   * No dust inside, especially on the bottom? -> A.I. before closing.
  * Leak point was fastened tightly? -> A.I. before closing.