Line 26: Line 26:
   * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940 -> Peak of pitch shifted to higher frequency from result of Feb.2. Needs remote centering for the Oplev first (Ushiba).    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940 -> A.I. Peak of pitch shifted to higher frequency from result of Feb.2. Needs remote centering for the Oplev first (Ushiba).
Line 58: Line 58:
  * Leak point was fastened tightly? -> A.I. before closing.   * Leak point was fastened tightly? -> A.I. when closing.
Line 60: Line 60:
  * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326)   * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326) -> it will be done on Mon.
Line 63: Line 63:
  * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?).   * FFU stop for the MCE/MCREFL optical table and reconstruction of the window shield (MCE, MCF?). -> measurement of length of legs.


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


??? Recovery(202404??)



??? Recovery(202404??)