Differences between revisions 63 and 66 (spanning 3 versions)
Revision 63 as of 2024-03-22 14:32:12
Size: 4323
Comment:
Revision 66 as of 2024-03-22 14:55:11
Size: 4914
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909 -> --(A.I. upload picth, yaw pico pictues (R.Takahashi), or taking picture for picth, yaw pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941
   * Gaps between magnets and coils -> MCo uppper is the minimum, but this is the best effort.
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909 -> --(A.I. upload pitch, yaw pico pictures (R.Takahashi), or taking picture for pitch, yaw pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941
   * Gaps between magnets and coils -> MCo upper is the minimum, but this is the best effort.
Line 14: Line 14:
   * Coil resistances and inductances -> inductances shoulg refer the past data if coil did not change, or it will be measured again (Wasimi, 3/24(Monday morning)    * Coil resistances and inductances -> A.I. Inductances should refer the past data if the coil did not change, or it will be measured again (Wasimi, 3/24(Monday morning)
Line 16: Line 16:
    *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696 -> One of the MCi resistance is low, but low may has no problem. If it is high, it may have some disconnection.     *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696 -> One of the MCi resistances is low, but low may have no problem. If it is high, it may have some disconnection.
Line 70: Line 70:
-------
Summary
-------
 * TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
 * All others should be OK for closing IMC chambers.
  * The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
  * Washimi-kun will measure inductances again on Monday.
  * Check no dust inside, especially on the bottom before closing.
  * Check the leak points are fastened tightly when closing.


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


Summary


  • TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
  • All others should be OK for closing IMC chambers.
    • The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
    • Washimi-kun will measure inductances again on Monday.
    • Check no dust inside, especially on the bottom before closing.
    • Check the leak points are fastened tightly when closing.


??? Recovery(202404??)



??? Recovery(202404??)


KAGRA/IFOIntegration2024/Recovery20240322 (last edited 2024-04-05 16:16:04 by miyoki)