Differences between revisions 65 and 66
Revision 65 as of 2024-03-22 14:54:49
Size: 4910
Comment:
Revision 66 as of 2024-03-22 14:55:11
Size: 4914
Comment:
Deletions are marked like this. Additions are marked like this.
Line 70: Line 70:
----- -------
Line 72: Line 72:
----- -------


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


Summary


  • TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
  • All others should be OK for closing IMC chambers.
    • The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
    • Washimi-kun will measure inductances again on Monday.
    • Check no dust inside, especially on the bottom before closing.
    • Check the leak points are fastened tightly when closing.


??? Recovery(202404??)



??? Recovery(202404??)


KAGRA/IFOIntegration2024/Recovery20240322 (last edited 2024-04-05 16:16:04 by miyoki)