Differences between revisions 70 and 73 (spanning 3 versions)
Revision 70 as of 2024-04-04 11:17:31
Size: 5305
Editor: miyoki
Comment:
Revision 73 as of 2024-04-04 11:33:15
Size: 6223
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 86: Line 86:
  * 5% power loss is concerned. It should be checked on 3~4 April.   * 5% power loss is concerned. It should be checked on 3~4 April. --> [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=29065 | klog#29065 ]]
Line 90: Line 90:
??? Recovery(202404??) EXC Recovery(202404??)
Line 92: Line 92:
 * Suspension health check (Takahashi, Ushiba)
  * A01: Cable check: Type-A:by R.Takahashi-san)
  * A02 Porality Check Type-A/C-Payload: OK Eddy Current Damping もOK
  * A03 RubbingCheck Type-A:
  * A04:4Range and Calibration Type-A:
  * A05: Watchdog Setting : Skip
  * A06:Height Measurement type-A
  * A08: Calibration Type-A:
  * A09: Spectrum No strange.
  * A10: Transfer Function No strange.
 * Oplev Check (Yokozawa, Akutsu)
  *
 *Tcam (Yokozawa and ChenDan, and Yamamoto)
 * TMSX optical system (Akutsu and his selected persons)
 * Baffle PDs (Yokozawa and his selected persons)
 *NAB, WAB (Akutsu)
 * Vacuum system (Kimura-san / Uchiyama-kun and their selected persons)
 * Cryo-system (Kimura-san and his selected persons)


------
*** Recovery(202404??)
------





------
*** Recovery(202404??)
------


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


Summary


  • TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
  • All others should be OK for closing IMC chambers.
    • The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
    • Washimi-kun will measure inductances again on Monday.
    • Check no dust inside, especially on the bottom before closing.
    • Check the leak points are fastened tightly when closing.


X-Pcal Recovery(20240402)


  • Dan's presentation files

    • Path2 drift is concerns. However, we expect we can compensate for the drift by using pico-mirrors.
    • 5% power loss is concerned. It should be checked on 3~4 April. --> klog#29065

    • Pcal-X noise in the Cal line is OK? --> klog#29075


EXC Recovery(202404??)


  • Suspension health check (Takahashi, Ushiba)
    • A01: Cable check: Type-A:by R.Takahashi-san)
    • A02 Porality Check Type-A/C-Payload: OK Eddy Current Damping もOK
    • A03 RubbingCheck Type-A:

    • A04:4Range and Calibration Type-A:
    • A05: Watchdog Setting : Skip
    • A06:Height Measurement type-A
    • A08: Calibration Type-A:
    • A09: Spectrum No strange.
    • A10: Transfer Function No strange.
  • Oplev Check (Yokozawa, Akutsu)
  • Tcam (Yokozawa and ChenDan, and Yamamoto)

  • TMSX optical system (Akutsu and his selected persons)
  • Baffle PDs (Yokozawa and his selected persons)
  • NAB, WAB (Akutsu)
  • Vacuum system (Kimura-san / Uchiyama-kun and their selected persons)
  • Cryo-system (Kimura-san and his selected persons)


*** Recovery(202404??)



*** Recovery(202404??)


KAGRA/IFOIntegration2024/Recovery20240322 (last edited 2024-04-05 16:16:04 by miyoki)