Line 7: Line 7:
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> --(A.I. upload picth pico pictues (R.Takahashi), or taking picture for picth pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941     * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907 -> --(A.I. upload pitch pico pictures (R.Takahashi), or taking picture for pitch pico.)-- -> https://klog.icrr.u-tokyo.ac.jp/osl/?r=28941
Line 20: Line 20:
    * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914 -> this does not matter for the suspension.     * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914 -> This does not matter for the suspension.
Line 26: Line 26:
   * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940 -> A.I. Peak of pitch shifted to higher frequency from result of Feb.2. Needs remote centering for the Oplev first (Ushiba).    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28940 -> A.I. Peak of pitch-shifted to higher frequency from the result of Feb.2. Needs remote centering for the Oplev first (Ushiba).
Line 73: Line 73:
 * TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.  * TF of MCe had a shift of peak frequency on the pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
Line 90: Line 90:
EXC Recovery(202404??) EXC Recovery(20240404)
Line 94: Line 94:
Type-A
  * A02 Porality Check Type-A/C-Payload: OK Eddy Current Damping もOK
  * A03 Rubbing Check Type-A:
   *A
   *C
   *
  * A02 Porality Check
*
  * A03 Rubbing Check
   *
Line 100: Line 100:
   *A
   *C
   *
Line 104: Line 103:
   * Done: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28780
Line 107: Line 107:
  * A09: Spectrum
   *A
   *C
  * A09: Spectrum(spectra of IM/MN photosensors.)
   * OK https://klog.icrr.u-tokyo.ac.jp/osl/?r=29102
Line 111: Line 110:
   *A
   *C
   * OK as modeling: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29100, https://klog.icrr.u-tokyo.ac.jp/osl/?r=29106
Line 114: Line 112:
  *   * MN: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28905
  * TM: Easy to find.
  * PF:
 * Green flash at REFL and Trans PD
  * REFL: OK
  * TMSX: No beam on PD.

 * X-Pcal homeworks
  * The spec loss at PBS can be comparable with the mysterious loss: Loss of power of ~ 5%: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29081
  * Cleaning inside was done : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29091

 *Windows Cleaning
  * Done: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28976,
  * Blanck ports:
Line 116: Line 128:
Line 117: Line 130:
Line 118: Line 132:
Line 119: Line 134:
  * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28757
  * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28758, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28627
Line 120: Line 138:
  * tie rods adjustment between EXC and TMSX to avoid stress when the only EXC side is pumped down.
  * Replaced flange
Line 121: Line 142:
  * All temp signals are obtained?


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


Summary


  • TF of MCe had a shift of peak frequency on the pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
  • All others should be OK for closing IMC chambers.
    • The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
    • Washimi-kun will measure inductances again on Monday.
    • Check no dust inside, especially on the bottom before closing.
    • Check the leak points are fastened tightly when closing.


X-Pcal Recovery(20240402)


  • Dan's presentation files

    • Path2 drift is concerns. However, we expect we can compensate for the drift by using pico-mirrors.
    • 5% power loss is concerned. It should be checked on 3~4 April. --> klog#29065

    • Pcal-X noise in the Cal line is OK? --> klog#29075


EXC Recovery(20240404)



*** Recovery(202404??)



*** Recovery(202404??)