Line 94: Line 94:
  * A02 Porality Check Type-A/C-Payload: OK Eddy Current Damping もOK    *
* A02 Porality Check Type-A/C-Payload
*
Line 96: Line 98:
   *A
   *C
   *
Line 99: Line 100:
   *A
   *C
   *
Line 103: Line 103:
   * Done: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28780
Line 110: Line 111:
   *A
   *C
   * Some GASs are strange? : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29100
Line 113: Line 113:
  *   * MN: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28905
  * TM:
  * PF:
Line 115: Line 117:
  * REFL: OK
  * Trans: No beam on PD.

 * X-Pcal homeworks
  * Loss of power of ~ 5%: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29081
  * Cleaning: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29091

 *Windows Cleaning
  * Done: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28976,
  * Blanck ports:
Line 117: Line 129:
Line 118: Line 131:
Line 119: Line 133:
Line 120: Line 135:
  * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28757
  * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28758, https://klog.icrr.u-tokyo.ac.jp/osl/?r=28627
Line 121: Line 139:
  * tie rods adjustment between EXC and TMSX to avoid stress when the only EXC side is pumped down.
Line 122: Line 142:
  * All temp signals are obtained?


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


Summary


  • TF of MCe had a shift of peak frequency on pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
  • All others should be OK for closing IMC chambers.
    • The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
    • Washimi-kun will measure inductances again on Monday.
    • Check no dust inside, especially on the bottom before closing.
    • Check the leak points are fastened tightly when closing.


X-Pcal Recovery(20240402)


  • Dan's presentation files

    • Path2 drift is concerns. However, we expect we can compensate for the drift by using pico-mirrors.
    • 5% power loss is concerned. It should be checked on 3~4 April. --> klog#29065

    • Pcal-X noise in the Cal line is OK? --> klog#29075


EXC Recovery(202404??)



*** Recovery(202404??)



*** Recovery(202404??)