Differences between revisions 9 and 28 (spanning 19 versions)
Revision 9 as of 2024-03-21 12:36:47
Size: 1636
Editor: miyoki
Comment:
Revision 28 as of 2024-03-22 08:50:11
Size: 3191
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28668
    *MCi/e: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28696
Line 8: Line 10:
    * MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28911
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28910
    * POM: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28914
Line 11: Line 16:
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28907
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28909
Line 13: Line 20:
    * Health MCo: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28890
    * Health MCi: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28889
    * Health MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
Line 15: Line 25:
    * MCe: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28915
    * MCi/o: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28913
Line 19: Line 31:
   * Inspection: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28856
Line 22: Line 35:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28912
Line 23: Line 37:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28779
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28839
Line 33: Line 49:
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28927
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28926
Line 34: Line 52:
   * In basic, No. Relocation was done. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28931
Line 40: Line 59:
  * MCE trans flange rotation
  * Lift-up tool check for bellows installation.
  * MCE trans flange rotation (the past activity is in https://klog.icrr.u-tokyo.ac.jp/osl/?r=28326)
  * Lift-up tool check for bellows installation. (past accident https://klog.icrr.u-tokyo.ac.jp/osl/?r=28344)
Line 44: Line 63:

----

[[ https://paper.dropbox.com/doc/Installation-Acceptance-Document-for-MCF-and-MCE-in-spring-2021--CLlN4mKPlOUb8YO5qXgdLVeBAg-9a7b8tlqCZ2cxodEcJhGY | one of templates for IMC closing by Akutsu-kun in 2021.]]


------
??? Recovery(202404??)
------



------
??? Recovery(202404??)
------


IMC Ecovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


??? Recovery(202404??)



??? Recovery(202404??)


KAGRA/IFOIntegration2024/Recovery20240322 (last edited 2024-04-05 16:16:04 by miyoki)