Size: 510
Comment:
|
Size: 1214
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
* Next meeting will be held around ?? (doodle poll will be circulated). | * Next meeting will be around mid.-end/Feb ?? (doodle poll will be circulated). |
Line 11: | Line 11: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9659|Slides]] | |
Line 12: | Line 13: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9590|Current version]] * Science still waiting; at least highlights can be shared/reminded inside FPC * Survey of technologies in progress * Squeezing and filter cavity (E. Capocasa) * Facility limitations (good contribution from Akutsu-san) * Schedule of white papers |
|
Line 13: | Line 20: |
* Talk from FPC at [[https://cgca.uwm.edu/events/2019lvc|LVC meeting]] * Positive response from the organizer; possible talk either at Joint Instrument Science session on Tuesday afternoon or the Plenary session on Thursday) |
FPC Meeting on 2019/02/05 15:00 - (JST)
Participants:
Zoom meeting(2): https://zoom.us/j/6676627462
- Next meeting will be around mid.-end/Feb ?? (doodle poll will be circulated).
Agenda
- Current progress of the white paper
- Science still waiting; at least highlights can be shared/reminded inside FPC
- Survey of technologies in progress
- Squeezing and filter cavity (E. Capocasa)
- Facility limitations (good contribution from Akutsu-san)
- Schedule of white papers
Talk from FPC (by Michimura-san or SH) at KIW5
Talk from FPC at LVC meeting
- Positive response from the organizer; possible talk either at Joint Instrument Science session on Tuesday afternoon or the Plenary session on Thursday)