Differences between revisions 2 and 6 (spanning 4 versions)
Revision 2 as of 2018-12-05 21:21:48
Size: 1005
Comment:
Revision 6 as of 2018-12-06 13:43:46
Size: 1599
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9313|Summary of Past Discussions on KAGRA Upgrade]]  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9313|Summary of Past Discussions on KAGRA Upgrade (>_<)]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8427|Observation scenario including LIGO/Virgo O5 upgrades]]
Line 10: Line 11:
   * High power laser (how much power? stability?)
   * Parametric instabilty vs power, mitigation schemes
   * Squeezing (squeezing level, losses)
   * Filter cavity (losses)
   * Mirror (mass, coating, absorption)
   * Suspending larger mirror
   * Suspension design for suspension thermal noise reduction
   * Extreme RSE (high SRM reflectivity possible?)
   * Newtonian noise cancellation
Line 11: Line 21:
   * Mirror size
   * Filter cavity length

Future Planning Committee (FPC) working wiki

Starting points

White paper

  • Scientific motivation
  • Survey of the current technologies (price and readiness)
    • High power laser (how much power? stability?)
    • Parametric instabilty vs power, mitigation schemes
    • Squeezing (squeezing level, losses)
    • Filter cavity (losses)
    • Mirror (mass, coating, absorption)
    • Suspending larger mirror
    • Suspension design for suspension thermal noise reduction
    • Extreme RSE (high SRM reflectivity possible?)
    • Newtonian noise cancellation
  • Limits of the current facility
    • Mirror size
    • Filter cavity length
  • Trade-off studies
  • Time scale of plans: near-term(more realistic) and longer-term(some dreams)
  • Back up plans
  • R&Ds to be done : input to the PRDC

  • Budget estimate
  • Project execution plan

Schedule for the white paper

  • Work in progress draft to be presented @ KIW in Feb 2019 : Feedbacks from Virgo
  • First draft to be circulated @ April 2019 F2F
  • Final version to be put for approval @ Aug 2019 F2F

KAGRA/KSC/FPC (last edited 2022-11-01 22:48:21 by SadakazuHaino)