1814
Comment:
|
2285
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
=== White paper === | === Draft of white paper === * Link to Dropbox: https://www.dropbox.com/sh/ry8x2x5wco4xbxx/AAAy782OD9Mhbca7Cov0Ws5Oa?dl=0 * Link to Dropbox (synced to Overleaf): https://www.dropbox.com/sh/69648a7g14ijwo0/AABWL9aZYA7ROIsrsNFim35Oa?dl=0 * Link to Overleaf: https://www.overleaf.com/project/5c091fbd8795b4614778100c === White paper plan === |
Line 12: | Line 17: |
* Parametric instabilty vs power, mitigation schemes [Michimura?] | * Parametric instabilty vs power, mitigation schemes [Michimura? KYamamoto?] |
Line 20: | Line 25: |
* Technological noises at low frequencies [Michimura?] | |
Line 22: | Line 28: |
* Mirror size * Filter cavity length |
* Mirror size in cryostat [KYamamoto?] * Filter cavity length [Matteo?] * Computing resources [Chunglee?] |
Future Planning Committee (FPC) working wiki
Starting points
Draft of white paper
Link to Dropbox: https://www.dropbox.com/sh/ry8x2x5wco4xbxx/AAAy782OD9Mhbca7Cov0Ws5Oa?dl=0
Link to Dropbox (synced to Overleaf): https://www.dropbox.com/sh/69648a7g14ijwo0/AABWL9aZYA7ROIsrsNFim35Oa?dl=0
Link to Overleaf: https://www.overleaf.com/project/5c091fbd8795b4614778100c
White paper plan
- Scientific motivation
- Survey of the current technologies (price and readiness)
- High power laser (how much power? stability?) [Haino?]
- Parametric instabilty vs power, mitigation schemes [Michimura? KYamamoto?]
- Squeezing (squeezing level, losses) [Matteo?]
- Filter cavity (losses) [Matteo?]
- Mirror (mass, coating, absorption) [Hirose?]
- Suspending larger mirror [Okutomi?]
- Suspension design for suspension thermal noise reduction (upper stage masses, sapphire blades, ribbon design) [Tomaru?]
- Improving heat conductivity of sapphire fibers [Tomaru?]
- Extreme RSE (high SRM reflectivity possible?) [Michimura?]
- Technological noises at low frequencies [Michimura?]
- Newtonian noise cancellation [Nishizawa?]
- Limits of the current facility
- Mirror size in cryostat [KYamamoto?]
- Filter cavity length [Matteo?]
- Computing resources [Chunglee?]
- Trade-off studies
- Time scale of plans: near-term(more realistic) and longer-term(some dreams)
- Back up plans
R&Ds to be done : input to the PRDC
- Budget estimate
- Project execution plan
Schedule for the white paper
- Work in progress draft to be presented @ KIW in Feb 2019 : Feedbacks from Virgo
- First draft to be circulated @ April 2019 F2F
- Final version to be put for approval @ Aug 2019 F2F