Differences between revisions 9 and 19 (spanning 10 versions)
Revision 9 as of 2018-12-06 13:47:30
Size: 1814
Comment:
Revision 19 as of 2018-12-07 09:22:15
Size: 2285
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
=== White paper === === Draft of white paper ===
 * Link to Dropbox: https://www.dropbox.com/sh/ry8x2x5wco4xbxx/AAAy782OD9Mhbca7Cov0Ws5Oa?dl=0
 * Link to Dropbox (synced to Overleaf): https://www.dropbox.com/sh/69648a7g14ijwo0/AABWL9aZYA7ROIsrsNFim35Oa?dl=0
 * Link to Overleaf: https://www.overleaf.com/project/5c091fbd8795b4614778100c

=== White paper plan ===
Line 12: Line 17:
   * Parametric instabilty vs power, mitigation schemes [Michimura?]    * Parametric instabilty vs power, mitigation schemes [Michimura? KYamamoto?]
Line 20: Line 25:
   * Technological noises at low frequencies [Michimura?]
Line 22: Line 28:
   * Mirror size
   * Filter cavity length
   * Mirror size in cryostat [KYamamoto?]
   * Filter cavity length [Matteo?]
   * Computing resources [Chunglee?]

Future Planning Committee (FPC) working wiki

Starting points

Draft of white paper

White paper plan

  • Scientific motivation
  • Survey of the current technologies (price and readiness)
    • High power laser (how much power? stability?) [Haino?]
    • Parametric instabilty vs power, mitigation schemes [Michimura? KYamamoto?]
    • Squeezing (squeezing level, losses) [Matteo?]
    • Filter cavity (losses) [Matteo?]
    • Mirror (mass, coating, absorption) [Hirose?]
    • Suspending larger mirror [Okutomi?]
    • Suspension design for suspension thermal noise reduction (upper stage masses, sapphire blades, ribbon design) [Tomaru?]
    • Improving heat conductivity of sapphire fibers [Tomaru?]
    • Extreme RSE (high SRM reflectivity possible?) [Michimura?]
    • Technological noises at low frequencies [Michimura?]
    • Newtonian noise cancellation [Nishizawa?]
  • Limits of the current facility
    • Mirror size in cryostat [KYamamoto?]
    • Filter cavity length [Matteo?]
    • Computing resources [Chunglee?]
  • Trade-off studies
  • Time scale of plans: near-term(more realistic) and longer-term(some dreams)
  • Back up plans
  • R&Ds to be done : input to the PRDC

  • Budget estimate
  • Project execution plan

Schedule for the white paper

  • Work in progress draft to be presented @ KIW in Feb 2019 : Feedbacks from Virgo
  • First draft to be circulated @ April 2019 F2F
  • Final version to be put for approval @ Aug 2019 F2F

KAGRA/KSC/FPC (last edited 2022-11-01 22:48:21 by SadakazuHaino)