KAGRA collaboration meeting


55th(International): Dec. 9, 2014 (Tuesday) 9:00~11:00 (JST)

Participants:(SeeVogh) Miyakawa, Saito, Uchiyama, Flaminio, Tagoshi, Ohishi, Aso, Narikawa, Hirose, Kawamura, Ohashi, Michimura, Somiya, Ueno (K), Itoh, Ueda (A), Takahashi (H), Kanda, Kanda Laboratory members, (Kashiwa) Kajita, Sakakibara, Tomaru, Majorana, Kuroda, Suzuki (T)

Agenda

  1. Project report (Kajita)

  2. SEO report (Saito)

  3. Installation of iKAGRA components (Uchiyama)

  4. Reports by IBR members(US(Koji Arai), SHNU(Xiang-hua Zhai),KGWG(Hyung-Mok Lee),Polish KAGRA(Tomasz Strecki))

  5. Necessity of KAGRA Council and rasing candidates of the members (Kuroda)

  6. Intermediate report on authorship policy (Ando/Kuroda)

SeeVogh Information


54th(in Japanese): Oct. 15, 2014 (Wednesday) 13:00~19:00

Kashiwa campus meeting room: 総合研究棟470号室;IP address for TV conference system:157.82.240.189 SeeVogh is booked as usual.

Participants:

[Kashiwa]Kajita,Tomaru,Tanaka,Miyamoto,Suzuki,Nishiuchi,Chen,Yamamoto,Sakakibara,Kuroda

[SeeVogh]Kanayama,Takahashi(H),Kawabe, Kandalab,Ishizaki,Itoh,Ohishi,Flaminio,Izumi,Hayama,Akutsu,Miyakawa,Yano,Saito(Y),Aso,Kawamura,Tagoshi,Sato(T),Ueno,Takahashi(R),Narikawa,yokoyama,hirose,Saito(T),Kataoka

Agenda

General Reports (13:00~15:00)

  1. Some thoughts on LIGO progress -Koji Arai (40 min)

  2. Project Report -Kajita (20 min)

  3. SE Office general report -Saito (20 min)

  4. Safety Control -Kuroda ( 10 min)

  5. Report of CPC -Flaminio ( 10 min)

  6. Report of PR -Aso ( 10 min)

  7. Geometry measurement in KAGRA -Tomaru( 10 min)

Subsystem reports I (15:00-15:30)

  1. Report of Input/output Optics (30 min)

Coffee Break (15:30-15:50)

Renewal of Project Plan (15:50-16:20)

  1. bKAGRA plan with the present budget expectation -Y. Aso (30 min)

Subsystem reports II (16:20~19:00)

  1. Report of Detector Characterization (10min)
  2. Report of Vibration Isolation subsystem (10 min)
  3. Report of Cryogenic subsystem (10 min)
  4. Installation Scheduling Uchiyama(20min)

  5. Report of Laser subsystem (15 min)
  6. Report of Auxiliary Optics subsystem (10 min)
  7. Report of Data Management subsystem (15min)
  8. Report of Data Analysis subsystem (15min)
  9. Report of DGS & AEL (15min)


53rd(International): Jun. 12, 2014 (Thursday) 17:00~19:00 (JST)

Participants:

[Kashiwa] Kajita, Yamamoto, Kawamura, Kuroda, Miyamaoto, Tanaka, Sakakibara, Yamanaka

[SeeVogh] Saito, Ohashi, Itoh, Hayama, Yuzurihara, Ando, Kanda, Flaminio, Ueno, Aso, Miyakawa(PolyCom)

Agenda

  1. Project report - Kajita

  2. SEO report - Saito

  3. Report of subsystem 1
  4. Report of subsystem 2
  5. Others


52th(Domestic): Apr. 16, 2014 (Wed) 13:00~(JST)

In prior to this doestic meeting, we have lectures for new members staring at 10:00 in the morning. The lecturers are Prof. Kentaro Somiya and Prof Yusuke Itoh.

  1. Gravitational-wave detector - Somiya (60 min)

  2. Gravitational-wave data analysis - Itoh (60 min)

Agenda

  1. Random thoughts about aLIGO and installation        -Kawabe (45min)

  2. Introduction of Fresh persons (10min)
  3. Project Report          -Kajita (20min)

  4. SE Office report (report of the external review)          –Ando (20min)

Coffee Break (14:35-15:00)

  1. Schedule of Installation & Commissioning          -Saito (20min)

  2. Report of each subsystem (a few topics selected by SEO)(70min)

    What can we do with iKAGRA ?, Aso Control System of Interferometer, Miyakawa, (30min) Specification of laser(LAS, Suzuki & Mio, 20min) Tunnel structure and status - Tunnel,- FCL, Uchiyama & Miyoki (20min)

  3. Status of VIS R&D          -Pena(20min)

  4. Status of Cryo-suspension          -Yamamoto(20min)

  5. Others (Safety control)          -Kuroda(10min)


51th(International): Dec. 10, 2013 (Tuesday) 9:00~11:00 (JST)

Participants:

[Kashiwa], D. Castellano, D. Chen, K. Hayama, T. Kajita, S. Kawamura, A.Khalaidovski, F. Picariello, I. Pinto, Y. Saito, K. Watanabe, K. Yamamoto

[SeeVogh], T. Akutsu, M. Ando, Y. Aso, O. Miyakawa, S. Miyoki, Y.Sakakibara, K. Somiya, H. Tagoshi, C. Tokoku, T. Uchiyama, H. Yamamoto,T. Yokozawa, H. Yuzurihara

Agenda

  1. Project report by Kajita [O]

  2. Outline of iKAGRA installation by SEO (Saito), which will include task of each SEO member.[O]

  3. Conference reports (Korea-Japan WS by Kawamura [O] and ET+ELiTES meetings by Somiya [o])

  4. Report of MIR subsystem by Kyohei Watanabe (CSIRO report)[O]

  5. Others


50th(Domestic): Oct. 9, 2013 (Wed) 13:00~(JST)

Agenda

  1. News from LIGO (Output Mode Cleaner by K. Arai)

  2. Project report (Kajita)[o]

  3. SE Office report (Saito)[o]

  4. Report of each subsystem (I)
  5. Report of each subsystem (II)
  6. Status and Schedule of Mirror (Hirose)[o]

  7. Test and Schedule of anti-vibration system (Prototype-B) utilizing TAMA facility [o]

  8. Design of Payload and Vertical anti-vibration system
  9. Current status and schedule of cryogenic payload[o]

  10. Others

Files


49th(International): June 19 (Wed) 17:00~(JST)

Participants:(Kashiwa) T.Kajita, S.Kawamura, K.Yamamoto, R.Takahashi, T.Akutsu, Y.Saito, Chen Dan, Y.Itoh, A.Khalaidovski, K.Ono, (SeeVogh) F.E.P.Arellano, K.Somiya, L.Biotti, N.Kanda, R.DeSalvo, S.Miyoki, T.H.Yoon, T.Yokozawa, T.Sekiguchi,T.Suzuki, W.Johnson,Y.Aso, K.Agatsuma,N.Kawai

Agenda

  1. Project report [O] (Kajita)

  2. SE Office report [O] (Somiya)

  3. Plan of Core-to-core program of JSPS [O] (Kawamura)

  4. Conferences and Meeting report [O] (Kuroda)

  5. Report of Subsystems (if needed)
  6. Others

Files


48th(Domestic): Apr. 17, 2013 (Mon) 13:00~(JST)

Agenda

  1. Introduction of fresh members [O](Kuroda)

  2. Project status report [O]((Kajita)

  3. Speech of new project manager and explanation of new organization and meetings (Saito)
  4. SE Office report (mainly on the new budget saving plan) & Management of JSPS core-to-core program [O] [O]((Kawamura)

  5. Installation and Commissioning [O] (Kawamura and Ohashi)

  6. Reports of sub-systems (Each Chief)
  7. Others