Differences between revisions 35 and 307 (spanning 272 versions)
Revision 35 as of 2014-11-01 13:33:48
Size: 4446
Comment:
Revision 307 as of 2019-05-11 00:17:27
Size: 9226
Editor: p7869123-ipngn36901marunouchi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
=== Date: October 31(Fri) ~ November 1(Sat) 2014 ===
=== Location: C205:Collaboration room(2F), Faculty of Science, University of Toyama Gofuku campus ===
=== Date: May 8(Wed) ~ 10(Fri), 2019 ===
=== Location: The University of Tokyo Future Center Initiative, 2nd floor, Room 205 ===
Line 7: Line 7:
 1. [[http://www.u-toyama.ac.jp/en/access/gofuku/index.html|University of Toyama Gofuku campus]]
 * [[attachment:University_of_Toyama_Campus_map.pdf|Campus map]]
 * [[http://www.mir.co.jp/en/route_map/|Access to Kashiwanoha-campus station of Tsukuba Express (TX) line]]
 * [[http://www.fc.u-tokyo.ac.jp/en/|The University of Tokyo Future Center Initiative]] at Kashiwanoha-campus station
 * [[http://www.gardenhotels.co.jp/eng/kashiwanoha/|Mitsui Garden Hotel]] at Kashiwanoha-campus station
Line 15: Line 16:
||Stan Whitcomb (Chair)||Caltech ||
||Bangalore Sathyaprakash||Cardiff University||
||Misao Sasaki||Yukawa Institute, Kyoto Univ.||
||Jo van den Brand||Nikhef||
||Gary Sanders||Thirty Meter Telescope project||
||Masanori Iye||NAOJ||
||Albert Lazzarini (Chair)||LIGO/Caltech ||
||Norna Robertson||LIGO/University of Glasgow ||
||Jo van den Brand||VIRGO/Nikhef||
||Bangalore Sathyaprakash||Pennsylvania State University||
||Misao Sasaki||IPMU, University of Tokyo||
||Junichi Watanabe||NAOJ||
Line 22: Line 23:
||David Mc''''''Clelland||ANU||
||Inwoo Han||Korea Astronomy and Space Science Institute||
||Jesper Munch||Adelaide University||
||Chang Hee Nam||IBS Center for Relativistic Laser Science||
Line 25: Line 26:
Observer
||Name ||Affiliation ||
|| || ||
||Hideyuki Kobayashi||NAOJ||
----
=== KAGRA visit ===
Line 30: Line 29:
{{{#!wiki comment/dotted

 * [[http://www.hyperdia.com/en/|Access to Toyama station]](put Toyama for destination)
 * We will use the ICRR car for the transportation between Excel Hotel Toyama and KAGRA site.
 * We will pick up PAB members who join KAGRA tour in front of Excel Tokyu hotel at 8:15AM. Please come to the entrance of Excel Tokyu hotel by 8:15AM.

}}}


||||||
||||▄▄▄▄▄▄▄▄▄▄▄▄▄ May 8 ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||||||
||||KAGRA site tour schedule||
||8:00||leaving ANA Toyama Hotel by car (accompany person: Miyakawa)||
||9:00||arriving KAGRA Observatory Office in Kamioka||
||9:30||leaving the Office||
||9:45-12:05||KAGRA site tour (Center and X-end)||
||12:05-12:45||lunch||
||12:55-13:35||SK tour||
||13:55||returning KAGRA Observatory Office||
||14:15||leaving the Office by car (accompany person: Miyakawa)||
||14:55||arriving Toyama Airport||
||||||Moving to Tokyo by airplane (accompany person: Miyakawa)||
||16:00||Toyama – 17:10 Tokyo (Haneda) [ANA320]||
||18:25||Haneda (Terminal 2) – 19:44 Kashiwanoha-campus [Airport shuttle bus]||

{{{#!wiki comment/dotted

||Time|| ||
||8:15||leaving Toyama Excel Tokyu Hotel||
||9:15||arriving KAGRA Observatory Office||
||9:45||leaving KAGRA Observatory Office||
||10:05-11:35||KAGRA Xend area visit||
||11:35-12:15||lunch||
||12:15-13:15||SK tour||
||13:15-14:20||KAGRA center area visit||
||14:40||arriving KAGRA Observatory Office||
||14:50||leaving KAGRA Observatory Office ||
||15:30||arriving Toyama Airport||
||||Moving to Tokyo by airplane (accompany person: ooooo)||
||16:10-17:20||Toyama - Tokyo (Haneda) [ANA320]||
||18:25-19:44||Haneda - Kashiwanoha-campus [Airport shuttle bus](Terminal 2)||

}}}
Line 34: Line 77:
||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄ October 31 ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||Time||Subject and Title||Speaker||
||||||||
||9:00-9:30||||(Closed session by PAB members only)||
||9:30-12:00||||||
|| ||Welcome||Prof. Endo, Toyama U President||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2942|Purpose of this PAB meeting and Status of the KAGRA project]]||T. Kajita||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2935|KAGRA collaboration status]]||K. Kuroda||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2945|Project management overview and the SEO activities]]||Y. Saito||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2948|Updated roadmap and milestone]]||Y. Aso||
||||||||
||<|2>12:00-16:00||||KAGRA visit||
||||<(>12:10 leaving University of Toyama(lunch on the bus)<<BR>>13:10 arriving GWPO Kamioka office<<BR>>13:20 - 14:40 KAGRA tour<<BR>>14:50 leaving GWPO Kamioka office<<BR>>15:50 arriving University of Toyama<<BR>><<BR>>※In the KAGRA tunnel, the temperature is about 14c and the floor is partially wet and dirty.<<BR>>We reccomend you to bring some clothes to keep you warm and not to wear new shoes.||
||||||||
||16:00-17:30||||||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2822|Safety]]||K. Kuroda||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2946|Schedule and shift management]]||T. Uchiyama||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2949|Organization of on-site]]||M. Ohashi||
||||||||
||<<BR>>||||Banquet||
||17:50||||<(>The shuttle bus to the restaurant leaves from University of Toyama.||
||18:30-20:30||||<(>"SAKURA WINE BAR"<<BR>>[[http://tabelog.com/toyama/A1601/A160101/16006435/dtlrvwlst/6450166/]]<<BR>>It is located near Toyama station.||
||||||||||
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ May 9 ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||||||||||
||Time||Subject and Title||Speaker||File||
|| || || || ||
||9:00-9:30||||(Closed session by PAB members only)|| ||
|||||||| ||
||9:30-9:50||Purpose of this PAB and Status of KAGRA||Kajita||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10163|o]]||
||9:50-10:10||Project management and SEO activities||Saito||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10140|o]]||
||10:10-10:40||KSC report||Shinkai||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10156|o]]||
||10:40-11:10||Responses to the recommendation by PAB2018||Ohashi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10159|o]]||
|| ||||20min Break|| ||
||11:30-12:00||KAGRA Roadmap/Risk Management||Ando||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10162|o]][[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10176|o]]||
||12:00-12:30||KAGRA schedule||Uchiyama||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10153|o]]||
||12:30-13:00||KAGRA commissioning report||Miyakawa||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10150|o]]||
||||||||||
||13:00-14:00||||Lunch|| ||
|||||||| ||
||14:00-14:30||KAGRA upgrade||Aso||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10151|o]]||
||15:00-15:30||KAGRA Data Analysis||Tagoshi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10161|o]]||
||15:30-16:00||KAGRA Infrastructure||Miyoki||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10154|o]]||
||16:00-16:30||KAGRA Safety||Ohashi||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10164|o]]||
|| ||||30min Break|| ||
||17:00-17:40||||Report of subgroup || ||
||17:00-17:20||CRY||Ushiba||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10160|o]]||
||17:20-17:40||DET||Yamamoto ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10152|o]]||
||17:40-18:30||||(Closed session by PAB members only)<<BR>>Question from PAB|| ||
||||||||||
||18:30-20:30||||||Banquet <<BR>> [[attachment:KAGRA/Meeting/Reviews/PAB/IMG_0082.jpg|{{attachment:KAGRA/Meeting/Reviews/PAB/IMG_0082th.jpg||width=250}}]] <<BR>> [[attachment:KAGRA/Meeting/Reviews/PAB/IMG_0084.jpg|{{attachment:KAGRA/Meeting/Reviews/PAB/IMG_0084th.jpg||width=250}}]]||
Line 57: Line 107:
||||||<style="text-align:center">▄▄▄▄▄▄▄▄▄▄▄▄▄ November 1 ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||||||||
||Time ||Subject and Title ||Speaker ||
||||||||
||9:30-10:30||||||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2944|External Review and the KAGRA response]]||M. Ando||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2931|Risk management]]||M. Ando||
||11:00-12:30||||||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2947|Installation of iKAGRA components]]||T. Uchiyama||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2955|Procedure of iKAGRA commissioning]]||S. Kawamura||
||||||(Lunch)||
||13:30-14:50||||||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2936|Vibration Isolation]]||R. Takahashi||
|| ||Cryo-payload and –suspension||T. Suzuki||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2956|Sapphire mirror status]]||E. Hirose||
|| ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2937|Data Analysis & Data Management]]||H. Tagoshi||
||15:00-16:00||||||
|| ||||Q&A||
|| ||Responding to inquiries submitted on the first day||KAGRA members||
|| ||||(Closed session by PAB members only)||
||16:30?~||||Concluding session (Preliminary remark from the committee)||
||||||||||
||||||||||
||||||||▄▄▄▄▄▄▄▄▄▄▄▄▄ May 10 ▄▄▄▄▄▄▄▄▄▄▄▄▄ ||
||||||||||
||Time ||Subject and Title ||Speaker ||File||
|| || || || ||
||8:15-9:00||||Continue closed session by PAB -- to include N. Robertson|| ||
||9:00-11:00||||Response to PAB Questions|| ||
||11:00-12:00||||(Closed session by PAB members only)|| ||
||12:00-13:00||||Comment from PAB||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10186|o]]||
||13:30||||Adjourn|| ||

----

== Q&A from PAB ==
||No.||Question from PAB||Answer||
|| || || ||
||1.||What are KAGRA managements’ thoughts regarding the impending departure of KEK from the MOU regarding KAGRA support in the area of cryogenics? Are there other areas of common areas of synergistic collaboration going forward beyond KAGRA construction and into operations?||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10182|o]]||
||2.||In KAGRA”s opinion, what constitutes an acceptable “physics result” in O3 that will ensure KAGRA’s continued funding by MEXT?||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10183|o]]||
||3.||What tasks will be assigned to (246) people spending time the observatory during science operations? How long will individual visitors be at the site? How will they be trained? How many will be contributing to keeping the detector in operation at its optimum operating point? Will they continue to work on their problems once they return to their home institutions?||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxxx|x]]||
||4.||With regard to safety concerns: We would like to know how much time/budget is involved in realizing the various remaining safety measures: specifically:<<BR>> - laser safety -- there should be a card-access based system to only allow laser-safety qualified staff to enter areas of high power laser hazards. Related: an automatic shutdown remains something that should be required and installed. The current manual safety shutdown is not sufficient in case of a serious accident.<<BR>> - air supply ducts -- ensuring adequate air supply in the event of a cave-in, especially at the X-end.||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxxx|x]]||
||5.||What does the risk register from 2015 look like? Is it possible for KAGRA to share this with the PAB tomorrow?||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxxx|x]]||
||6.||Can KAGRA show their projections of the transfer function and attenuation of ground motion for Type-A VIS that has 3 stages mechanically shorted? Specifically, is there an h[f] curve that characterizes this configuration?||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxxx|x]]||
||7.||What are KAGRA’s plans for on-line data analysis plans? How many real-time trigger generators will be running? Which ones are they?||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxxx|x]]||
||8.||What is the decision-making process within KAGRA organization? The PAB found it peculiar that a number of presenters showed “personal opinions” as part of their presentations, e.g., modified schedules etc.||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10184|o]]||
||9.||How does KAGRA approach public outreach, especially to the stakeholders (funding agencies and the general public). The PAB considers this important as KAGRA contemplates seeking additional funding.||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10185|o]]||

Program Advisory Board


Date: May 8(Wed) ~ 10(Fri), 2019

Location: The University of Tokyo Future Center Initiative, 2nd floor, Room 205


Reviewers

Name

Affiliation

Albert Lazzarini (Chair)

LIGO/Caltech

Norna Robertson

LIGO/University of Glasgow

Jo van den Brand

VIRGO/Nikhef

Bangalore Sathyaprakash

Pennsylvania State University

Misao Sasaki

IPMU, University of Tokyo

Junichi Watanabe

NAOJ

Akira Yamamoto

KEK

Jesper Munch

Adelaide University

Chang Hee Nam

IBS Center for Relativistic Laser Science


KAGRA visit

▄▄▄▄▄▄▄▄▄▄▄▄▄ May 8 ▄▄▄▄▄▄▄▄▄▄▄▄▄

KAGRA site tour schedule

8:00

leaving ANA Toyama Hotel by car (accompany person: Miyakawa)

9:00

arriving KAGRA Observatory Office in Kamioka

9:30

leaving the Office

9:45-12:05

KAGRA site tour (Center and X-end)

12:05-12:45

lunch

12:55-13:35

SK tour

13:55

returning KAGRA Observatory Office

14:15

leaving the Office by car (accompany person: Miyakawa)

14:55

arriving Toyama Airport

Moving to Tokyo by airplane (accompany person: Miyakawa)

16:00

Toyama – 17:10 Tokyo (Haneda) [ANA320]

18:25

Haneda (Terminal 2) – 19:44 Kashiwanoha-campus [Airport shuttle bus]


Program

▄▄▄▄▄▄▄▄▄▄▄▄▄ May 9 ▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Subject and Title

Speaker

File

9:00-9:30

(Closed session by PAB members only)

9:30-9:50

Purpose of this PAB and Status of KAGRA

Kajita

o

9:50-10:10

Project management and SEO activities

Saito

o

10:10-10:40

KSC report

Shinkai

o

10:40-11:10

Responses to the recommendation by PAB2018

Ohashi

o

20min Break

11:30-12:00

KAGRA Roadmap/Risk Management

Ando

oo

12:00-12:30

KAGRA schedule

Uchiyama

o

12:30-13:00

KAGRA commissioning report

Miyakawa

o

13:00-14:00

Lunch

14:00-14:30

KAGRA upgrade

Aso

o

15:00-15:30

KAGRA Data Analysis

Tagoshi

o

15:30-16:00

KAGRA Infrastructure

Miyoki

o

16:00-16:30

KAGRA Safety

Ohashi

o

30min Break

17:00-17:40

Report of subgroup

17:00-17:20

CRY

Ushiba

o

17:20-17:40

DET

Yamamoto

o

17:40-18:30

(Closed session by PAB members only)
Question from PAB

18:30-20:30

Banquet
attachment:KAGRA/Meeting/Reviews/PAB/IMG_0082.jpg
attachment:KAGRA/Meeting/Reviews/PAB/IMG_0084.jpg

▄▄▄▄▄▄▄▄▄▄▄▄▄ May 10 ▄▄▄▄▄▄▄▄▄▄▄▄▄

Time

Subject and Title

Speaker

File

8:15-9:00

Continue closed session by PAB -- to include N. Robertson

9:00-11:00

Response to PAB Questions

11:00-12:00

(Closed session by PAB members only)

12:00-13:00

Comment from PAB

o

13:30

Adjourn


Q&A from PAB

No.

Question from PAB

Answer

1.

What are KAGRA managements’ thoughts regarding the impending departure of KEK from the MOU regarding KAGRA support in the area of cryogenics? Are there other areas of common areas of synergistic collaboration going forward beyond KAGRA construction and into operations?

o

2.

In KAGRA”s opinion, what constitutes an acceptable “physics result” in O3 that will ensure KAGRA’s continued funding by MEXT?

o

3.

What tasks will be assigned to (246) people spending time the observatory during science operations? How long will individual visitors be at the site? How will they be trained? How many will be contributing to keeping the detector in operation at its optimum operating point? Will they continue to work on their problems once they return to their home institutions?

x

4.

With regard to safety concerns: We would like to know how much time/budget is involved in realizing the various remaining safety measures: specifically:
- laser safety -- there should be a card-access based system to only allow laser-safety qualified staff to enter areas of high power laser hazards. Related: an automatic shutdown remains something that should be required and installed. The current manual safety shutdown is not sufficient in case of a serious accident.
- air supply ducts -- ensuring adequate air supply in the event of a cave-in, especially at the X-end.

x

5.

What does the risk register from 2015 look like? Is it possible for KAGRA to share this with the PAB tomorrow?

x

6.

Can KAGRA show their projections of the transfer function and attenuation of ground motion for Type-A VIS that has 3 stages mechanically shorted? Specifically, is there an h[f] curve that characterizes this configuration?

x

7.

What are KAGRA’s plans for on-line data analysis plans? How many real-time trigger generators will be running? Which ones are they?

x

8.

What is the decision-making process within KAGRA organization? The PAB found it peculiar that a number of presenters showed “personal opinions” as part of their presentations, e.g., modified schedules etc.

o

9.

How does KAGRA approach public outreach, especially to the stakeholders (funding agencies and the general public). The PAB considers this important as KAGRA contemplates seeking additional funding.

o



KAGRA/Meeting/Reviews/PAB (last edited 2024-10-30 08:42:31 by miyoki)