Line 9: Line 9:
1) Y arm GR phase lock fringe became so small. -> temporally we adjust
the mid fringe position. The adjustment instruction was already posted
1) Y arm GR phase lock fringe became so small. -> temporally we adjust the mid fringe position. The adjustment instruction was already posted
Line 13: Line 12:
2) A strange LSC-LOCK guardian code seemed to force the IFO unlock just
after Observation mode start. This statement was commented out.
2) A strange LSC-LOCK guardian code seemed to force the IFO unlock just after Observation mode start. This statement was commented out.
Line 16: Line 14:
3)MCo coil outputs seem to have large offset. Kokeyama-san will off-load
in some timing.
3)MCo coil outputs seem to have large offset. Kokeyama-san will off-load in some timing.
Line 19: Line 16:
4) In the early morning on 13th April, the ocean became super violent,
then IFO cannot be locked. So we gave up the IFO lock and decided to
keep only alignment hopefully until the Tuesday morning, or Tuesday
4) In the early morning on 13th April, the ocean became super violent, then IFO cannot be locked. So we gave up the IFO lock and decided to keep only alignment hopefully until the Tuesday morning, or Tuesday
Line 24: Line 19:
Full alignment maybe from IMMT1/2 for enhancing POP90 will be done in
this case.
Full alignment maybe from IMMT1/2 for enhancing POP90 will be done in this case.
Line 27: Line 21:
Anyway, the Monday shift until 9:00 on Tuesday was canceled.
I will inform more about our plan later
Anyway, the Monday shift until 9:00 on Tuesday was canceled. I will inform more about our plan later
Line 31: Line 24:
5) The planed CAL tasks during maintenance will be done after this
recovering IFO. 3 or more hours will be allocated.
5) The planed CAL tasks during maintenance will be done after this recovering IFO. 3 or more hours will be allocated.
Line 68: Line 60:
Route 41 has been affected by the slope collapse at Katakake in Toyama
City.
Route 41 has been affected by the slope collapse at Katakake in Toyama City.
Line 71: Line 62:
As a result, the direct bus service between Toyama Station and Mozumi
has been suspended.
As a result, the direct bus service between Toyama Station and Mozumi has been suspended.
Line 74: Line 64:
The JR Takayama Line and the buses between JR Inotani Station and
Kamioka are operating as usual.
The JR Takayama Line and the buses between JR Inotani Station and Kamioka are operating as usual.
Line 82: Line 71:
国道41号線は富山市片掛(道の駅林林付近)での法面崩落の影響で、
4/10より片掛ー猪谷間が通行止めとなっています。
このため、富山駅ー茂住間の直通バスが運休となっています
国道41号線は富山市片掛(道の駅林林付近)での法面崩落の影響で、 4/10より片掛ー猪谷間が通行止めとなっています。
このため、富山駅ー茂住間の直通バスが運休となっています


KAGRA information


Basically, stable operation until 13th early morning. The longest continuous lock was 11h 51m. After recording this longest lock, we found,

1) Y arm GR phase lock fringe became so small. -> temporally we adjust the mid fringe position. The adjustment instruction was already posted by Sugimoto-kun. If possible, we will try.

2) A strange LSC-LOCK guardian code seemed to force the IFO unlock just after Observation mode start. This statement was commented out.

3)MCo coil outputs seem to have large offset. Kokeyama-san will off-load in some timing.

4) In the early morning on 13th April, the ocean became super violent, then IFO cannot be locked. So we gave up the IFO lock and decided to keep only alignment hopefully until the Tuesday morning, or Tuesday midnight in the pessimistic case.

Full alignment maybe from IMMT1/2 for enhancing POP90 will be done in this case.

Anyway, the Monday shift until 9:00 on Tuesday was canceled. I will inform more about our plan later

5) The planed CAL tasks during maintenance will be done after this recovering IFO. 3 or more hours will be allocated.

shift summary

11th day http://klog.icrr.u-tokyo.ac.jp/osl/?r=14106

night http://klog.icrr.u-tokyo.ac.jp/osl/?r=14117

midnight http://klog.icrr.u-tokyo.ac.jp/osl/?r=14118

12th day http://klog.icrr.u-tokyo.ac.jp/osl/?r=14119

night http://klog.icrr.u-tokyo.ac.jp/osl/?r=14129

midnight http://klog.icrr.u-tokyo.ac.jp/osl/?r=14132


General information from KAGRA office


1) R41 conditions

Route 41 has been affected by the slope collapse at Katakake in Toyama City. The route between Katakake and Inotani is closed to traffic from April10. As a result, the direct bus service between Toyama Station and Mozumi has been suspended. Also, regurar size cars can take the detour route to Kamioka. The JR Takayama Line and the buses between JR Inotani Station and Kamioka are operating as usual.

information (only Japanese) https://webun.jp/item/7652717 http://www.hrr.mlit.go.jp/toyama/

国道41号線は富山市片掛(道の駅林林付近)での法面崩落の影響で、 4/10より片掛ー猪谷間が通行止めとなっています。 このため、富山駅ー茂住間の直通バスが運休となっています

なお、普通自動車は神通川対岸の迂回ルートで神岡方面に通行可能です。 JR高山線、猪谷駅ー神岡間のバスは通常通り運行しています。

今のところ通行止め解除の見通しは立っていません。

北日本新聞4/11朝刊 https://webun.jp/item/7652717

富山国道河川事務所 http://www.hrr.mlit.go.jp/toyama/ ※迂回路無しとありますが、神通川対岸のルートで迂回可能です。 道が狭いので運転には注意して下さい。

2)COVI-19 situation in Toyama and SK/KAGRA temporal plan

Toyama Prefecture has also become a pretty dangerous area. I basically recommend you to take"Telework" as a response to it.

But the staff who maintain the KAGRA run should come to Kamioka site. If you come to Kamioka site, please send e-mail to

Situation will change daily, but please deal with it calmly. Thank you for your cooperation.

重力波施設の皆様(神岡)

富山でも感染者が増えつつあります。 今後は、基本的に在宅勤務を推奨します。

ただし、KAGRA観測をリモートで維持するのは困難なので、 KAGRAの観測維持に必要なスタッフは出勤してください。

出勤か在宅勤務かは、私と事務室に報せてください。 あとで就労管理の際にも必要となります。

以上、日々対応が変化しますが、冷静に対処してください。 宜しくお願いします。

Masatake Ohashi Director, KAGRA Observatory

3) Saito-sensei's mother has died. We would like to send our condolences to Saito-sensei on the loss of his mother.