Line 14: | Line 14: |
2) However, M6.9 earthquake happened around 17:26 on 18th April, then IFO was shaked. To protect suspensions, All type-A are set tower damp mode. |
2) However, M6.9 earthquake happened around 17:26 on 18th April, then IFO was shaked. To protect suspensions, All type-A are set tower damp mode. |
Line 24: | Line 22: |
14th | 17th |
Line 26: | Line 25: |
Line 29: | Line 29: |
Line 32: | Line 33: |
KAGRA information
1) IFO was quite stable until around 3:00 on 18th April. After this unlock, we failed to recover the IFO with good sensitivity because we took worse process for recovering GR trans more.
Because of this miss, we took almost 12 hours for recovering IFO with now 630 kpc binary range around 17:00 on 18th April.
Please refer the following klog to avoid failures again.
http://klog.icrr.u-tokyo.ac.jp/osl/?r=14234
2) However, M6.9 earthquake happened around 17:26 on 18th April, then IFO was shaked. To protect suspensions, All type-A are set tower damp mode.
shift summary
17th
day
http://klog.icrr.u-tokyo.ac.jp/osl/?r=14230
night
http://klog.icrr.u-tokyo.ac.jp/osl/?r=14232
midnight
http://klog.icrr.u-tokyo.ac.jp/osl/?r=14233
General information from KAGRA office
nothing