⇤ ← Revision 1 as of 2023-05-16 13:34:39
Size: 422
Comment:
|
Size: 424
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
*Time
- 8:00 ~ 12:00 or until the end of CAL just before restarting the observation
- The max end time: 16:00
*Contents
- (1)8-9: CAL for the previous week's observation.
- (2)9-11(or 12):
- Kamioka Mine Company: Tunnel Inspection.
- Kagra site staff: Instrument checks
- VAC/CRY: Check by Kimura-san + kagra sute staff
- (3)After(2): CAL for the next week's observation.
- (4)Restart observation after(3)