*https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0149/L2314962/001/Expected_SDF_changes_in_CAL_during_O4.html | *Measurement items: [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0149/L2314903/001/CAL_measurement_O4.html|JGW-L2314903]] *Weekly change in SDF: [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0149/L2314962/001/Expected_SDF_changes_in_CAL_during_O4.html|JGW-L2314962]] |
- Time
- 8:00 ~ 12:00 or until the end of CAL just before restarting the observation
- The max end time: 16:00
- Contents
- (1)8-9: CAL for the previous week's observation(CAL-G). The shooting of the mirror height(Yuzurihara). Finesse measurement(Oshino).
- (2)9-11(or 12):
- Kamioka Mine Company: Tunnel Inspection
- Kagra site staff: Instrument checks
- VAC/CRY: Checked by Kimura-san + KAGRA site staff
- VIS offload if necessary (Takahashi.R)
- (3)After(2): CAL for the next week's observation.
- (4)Restart observation after(3)
- CAL activities
Measurement items: JGW-L2314903
Weekly change in SDF: JGW-L2314962
- DGS
- In basic, we don't touch.