Differences between revisions 1 and 14 (spanning 13 versions)
Revision 1 as of 2023-05-16 13:39:16
Size: 167
Editor: miyoki
Comment:
Revision 14 as of 2023-06-01 09:51:10
Size: 969
Editor: satoru.ikeda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
 *Alignment works Manual  *[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14969 | Alignment works Manual ]]
  *In the control room (also in NAOJ), you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
   *Kamioka Control Room: on a whiteboard on the right wall side.
   *NaoJ Control Room: ?? (Takahashi-san will put)

 * MEDM to assist operator work
  * Open OPERATOR.adl:[sitemap]-[Commissioning]-[Commissioning Dock]-[OPERATOR]
Line 5: Line 11:

 * [[https://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Observation/O4a/Tips| Operators Work Tips]]

 *If an Expert (+ KAGRA Site staff at the entrance if necessary) needs to enter the KAGRA site.
  *Please contact Miyoki/Uchiyama via mobile phone. If no response, please notice to Miyoki/Uchiyama by SLACK.
  • Alignment works Manual

    • In the control room (also in NAOJ), you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
      • Kamioka Control Room: on a whiteboard on the right wall side.
      • NaoJ Control Room: ?? (Takahashi-san will put)
  • MEDM to assist operator work
    • Open OPERATOR.adl:[sitemap]-[Commissioning]-[Commissioning Dock]-[OPERATOR]
  • Daily check items
  • Operators Work Tips

  • If an Expert (+ KAGRA Site staff at the entrance if necessary) needs to enter the KAGRA site.
    • Please contact Miyoki/Uchiyama via mobile phone. If no response, please notice to Miyoki/Uchiyama by SLACK.

KAGRA/Observation/O4a/manuals (last edited 2023-06-01 09:51:10 by satoru.ikeda)